Design Team w/c 17/04/23 Meeting Minutes

Date

Week commencing : 17 April 2023

Attendees

@Alinta Lim @dominic.harrison @zara fong @Tanya Rechberger @Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) @Michele DiBlasio (Unlicensed)

Mtg Pending

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick @Sebastian

Project Updates:

GREEN : No more changes  

AMBER: Possibility for changes 

RED: Will more than likely change

BLUE : New Project

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT

STATUS

RELEASE STATUS

 

 

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT

STATUS

RELEASE STATUS

 

 

@Mina Bassilious (Unlicensed)

@Jordan Ruchalski (Unlicensed)

PALLINO PORTABLE

LIGHTING

ongoing

Tarmac will start prototyping new anodised colour options slowly. Colours driven by Michele.

Stock will be late, should be confirmed how long the lead time before sale period starts. Tarmac will let Michele know all stock lead times prior to sale start in order for showroom communication.

Spare parts- Mina will look into it and compare to other products ask Yoshi. Then enter spare part items into SAP.

FLOCK on the water, arrive by Post Autumn

Purchase order split into 4 sections, next 3 orders can have colour changes based on market feedback.

 

POST AUTUMN

May 1st

Completed

ready for shipment
FLOCK production
Final production completed

GREEN

 

@Mina Bassilious (Unlicensed)

@Jordan Ruchalski (Unlicensed)

AURA PENDANT

LIGHTING

ongoing

Final samples arrived in TU. Product development 100% complete.

Package design completed.

Deep etch on Wednesday 19/04 and start on Customer/showroom documentation.

Testing the operation mech, 5000 cycles usability. Put this information in product info sheets. Whole product warranty Mina check that it fits in with current warranty pendant system in King range.

Costings received, awaiting Damien’s feedback. Will push him again.

Will need to speak to Michele re lighting introduction process. Could consider holding release back.

Ask Anna B how quick the turnaround would be for good design awards entry.

Name update! Mina send the original name list back around for discussion.

WINTER- air freight for flock would be required- and stock for immediate release?

Jun 15

Production week 26th March

Ideation
prototyping
design review
supplier handover
sampling
Customer/showroom documentation

GREEN

 

 

@Mina Bassilious (Unlicensed)

LUNA TIMBER

BARSTOOL

 

In store.

Some damage to packaging. Sam Vergas handling it- Tarmac will follow up to confirm this.

Counter stool height on the way, lead time confirmation before entering into flock. Mina will contact Michele on this just to confirm.

AUTUMN

Mar 23

ETA Mar 25

Done
Customer/showroom documentation
Counter height in sampling

GREEN

 

 

@Mina Bassilious (Unlicensed)

ELEVATE

HOME-OFF

ongoing

Sample completed in GL (missing under desk storage components).

Sample was great, but need to speak to mech supplier on the height minimisation (critical).

Cecco top sample and costing underway, expected this week. Awaiting rest of product costing from GL.

Xiangu sample also completed, awaiting costings from Xiangyu and JiaShun.

Investigate how to have a timber ellipse sleeve on the raising mechanism.

SPRING

Sept 14

early July

Ideation
prototyping
design review
supplier handover
sampling

RED

 

 

@Mina Bassilious (Unlicensed)

SOLAIR ALU POCKET Accessory (with shade/turn dial shape)

ACCESSORY

ongoing

Samples received from supplier for review - review sent and feedback received, they will implement updates, new sample underway.

Only black only is suitable for deep etch as silver is unlikely to be ready in time. Deep etch team can manage with this as long as they have a silver swatch to use for photoshop.

Package design done- in sampling with supplier. 1 weeks.

Not suitable to add light colour update at this late stage. Looking to see if the supplier has an option to change from ‘cool to warm’ light and can’t implement possibly integrate with Home Automation Systems (speak with Tony on DNC on Cloud)

Lead time on new sample with CNC’d parts - approved concept awaiting sample.

In terms of production readiness for flock is very much PO dependent. Mina will push Yoshi to send purchase order once design is finalised.

WINTER- airfreight would be required. Product not completed yet.

-

-

Ideation
prototyping
design review
supplier handover
sampling

AMBER

 

 

@Mina Bassilious (Unlicensed)

HELIO PENDANT

LIGHTING

ongoing

Decided to move to electrical up down down mech due to costs and risks associated with converting manual to multi point system. Tarmac keep conversation moving with Coffey on the electrical up down system. Also Tarmac contact Dylan re App release schedule to decide whether we release with App or with remote functionality instead.

Not shooting until a direction has been decided.

Tarmac to set meeting with TR regarding the modular details conversation before discussion with DK.

WINTER- airfreight required for flock most likely.

June 15

N/A

Ideation
prototyping
design review
supplier handover
sampling

AMBER

 

 

@Mina Bassilious (Unlicensed)

ETO DESK V2.0

HOME-OFF

ongoing

Timber accessories all samples complete.

Handful of adjustments with the team, Mina managing in a document.

paused

June 15

early April

RED

 

 

@Mina Bassilious (Unlicensed)

ETO TBL LAMP

HOME-OFF

ongoing

Sample arrived, 95% sample, assessment by Tom required and Tanya talk to DK. Oak colour is wrong.

Review with Tom with May.

paused- see above

June 15

early April

RED

 

 

@Mina Bassilious (Unlicensed)

ETO TASK LIGHT

HOME-OFF

ongoing

Sample arrived, 95% sample, assessment by Tom required and Tanya talk to DK.- battery missing. Need to make it a non-tipping product after Tom assesses it. Oak colour is wrong.

Review with Tom with May.

paused- see above

June 15

early April

RED

 

 

want to move designer

ARC FLOOR (Adjust)

LIGHTING

ongoing

DK feedback was very positive and greatly appreciated. 2nd prototype starting this week for DK request to eclipse from the base. Tooling will be costly but will prototype anyway. DK approved but let’s have the conversation with DK again on form. Pricing of tapered component if worthwhile Michele will look into and get back to us 21st Feb.

Double illumination for up/down + dimming + app integration

UNASSIGNED

 

 

RED

 

 

@Mina Bassilious (Unlicensed)

LUNA MESH BARSTOOL & COUNTER STOOL

OUTDOOR

 

BAR STOOL: Sample reviewed by CW.

The tooling done on the stool is incorrect, this needs to be addressed with GL & fabricator. A whole new seat form has been developed with updates- prototyping request with soft tool (limited use). Find out info on pricing and timing of soft tool- Mina.

COUNTER STOOL: Shorter frame approved and will be incorporated into Timber stool, same base concept used for mesh stool.

POST WINTER

Aug 3

Early May

GREEN

 

 

@Mina Bassilious (Unlicensed)

LUNA UPH

BARSTOOL

& COUNTER STOOL

ongoing

BARSTOOL & COUNTER STOOL: Tooling due 20th March. Have to shift to post winter- want to have photography sample by mid May- Air freight an extra preproduction flock sample for this.

Dome consideration to add to seat top.

COUNTER STOOL: Good to go once top is approved.

 

POST WINTER

Aug 3

16th May

GREEN

 

 

@Mina Bassilious (Unlicensed)

ELEMENT EXTENSION TBL

OUTDOOR

Ongoing

New concept. DK to approve concept/range plan.

Waiting on Tanya looking over the brief. (Need to discuss with DK.)

Note: design direction from DK is with a D end.

Extension mech spec sheet needed by the supplier.
@tanya needs to discuss with DK.

Mina do concepts by next week to review.

Not assigned- paused. Need proper brief.

 

 

NEW

 

 

@Mina Bassilious (Unlicensed)

@Jordan Ruchalski (Unlicensed)

DESK CHAIR

HOME-OFF

ongoing

Initial prototype with timber back has been reviewed by DK - feedback was works well with ETO desk.

Not assigned- paused until time allocation completed.

 

 

NEW

 

 

@Mina Bassilious (Unlicensed)

LIGHTING GALLERY

VM

stopped

Michele spoke to Jackie/Vickie/Emily on requirements

Michele feels that in store over product display is a better solution and feasible post Michael discussion. Michele will discuss with DK if he’s in agreement. Design of gallery on pause until DK conversation as may not be required.

Not a project as company agreed to install into ceiling.

Not Assigned

-

-

RED

 

 

@Mina Bassilious (Unlicensed)

DIRECTORS CHAIR

OUTDOOR

 

Prototype underway with Italian John and 3D printing underway, expect sample this week.

1st prototype metal frame completed. Possibly need to do a hack job for the seat due to Allan’s holiday.

Unassigned as yet

Aug 3

Early May

RED

 

 

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

FIREFLY- outdoor lantern

OUTDOOR

 

Brief - portable, charging, ip rated, fabric integration for softer feel. Concept stage- conversation with Tanya once prototypes are completed. Jordan to look into mozzie repellant incorporation.

Rough design brief completed by Wednesday 19/04 to send to DK for review.

Post spring

Aug 3

Early May

RED

 

 

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

BAR CABINET

CASED GOODS

 

Commercialisation stage of this product to be considered with Michele first. It has been started, Priorities need to be defined.

Deprioritised

 

 

 

 

 

 

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

CASED GOODS

CASED GOODS

 

Commercialisation stage of this product to be considered with Michele first.

Deprioritised

 

 

 

 

 

 

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

HIGH-LOW floor light

LIGHTING

 

Commercialisation stage of this product to be considered with Michele first.

DePrioritised

 

 

 

 

 

 

 

 

 

 

 

 


 

 

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

 

STATUS

 

 

@Alinta Lim

@dominic.harrison

ADELAIDE

BEDROOM

 

Proceeding- die casting underway, not worried. Some unusual proceedings with tooling, will have to wait and see.

Injection moulding (family tooling) due 2314 production week.

Veneering pricing underway. Veneering samples fading too fast compared to GL samples, Dylan finding out if issues.

Pricing is too high for veneering, Will price product (DK decision) assuming 50% cost reduction from TH.

Bed instructions are critical. Dom will do a back up video but Brandon is managing for drivers.

Packaging sent over. Ji is started.

Thailand trips booked, Dom for preparation. Alinta will travel for Flock.

Knock-ins will be tooled in China, Jason approved.

Working on extending sizing rollout after flock.

Getting Futuro fabric in Thailand requires some work. Alinta to work on. On the way.

Mosquito net fabric comes from GL, on the way.

California King- not for US flock, but will be offered- GL for mattress, and other beds.

Alinta has sent BOM costing from GL to Jason on 24/03, Jason takes it from here.

SAP preparation underway.

 

WINTER

 

June 15

Early April.

Qty: 15 pieces

AMBER

 

@Alinta Lim

DUNE

CASE

 

DK approved current leg design and low style (not in line with mattress height), Alinta will expand the range as necessary and work with JiaShun on further updates. (Draw mech etc)

Ask Dylan about testing criteria.

WINTER

 

June 15

Early April.

Qty: 15 pieces

RED

 

 

@Alinta Lim

@dominic.harrison

CABANA

OUTDOOR

 

Working with Dylan on these samples.

Still to design: - Corner caps shade system- update CAD and send off 27/03- assess lead time requirements, sun lounge headrest covering system- underway with Allan. Most finished this week.

Aluminium cover

Having issues with Frank on Reticulated foam pricing- Dom will ask Frank to order despite high price.

Powder coat samples not yet received from Thailand- still awaiting TH on this. Alinta follow up with Ji, Dom taking samples with him.

Extra design considerations, not looking at yet:

  • existing ceramics

  • consider ice bucket in platform table (needs to be stunningly achieved)

POST WINTER

 

Aug 3

Early May

Qty: TBA

AMBER

 

 

@Alinta Lim

GAZEBO

OUTDOOR

 

Scope stage, new project suggestion by DK

Not assigned

-

-

NEW

 

 

@Alinta Lim

@dominic.harrison

GARDEN CHAIR + OLIVE TABLE

OUTDOOR

 

In limbo, awaiting update from Alinta during Thailand trip.

POST WINTER

Aug 3

Early May

Qty: TBA

RED

 

 

@Alinta Lim

@dominic.harrison

PLATELETT TABLE

OUTDOOR

 

Adjustable height with manual turning mech. Material selection to be discussed with DK.

  • consider transferring to Mina. Tanya to talk to DK and Alinta.

POST WINTER

Aug 3

Early May

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

@dominic.harrison

KATO

OUTDOOR

 

  • underway- GL starting on as much as possible.

  • urgent is reticulated foam and mesh cover- Angela following up supplier from fair.

  • weaving material- awaiting GL purchasing

  • timber composite samples through Allan and costings of exisitng parts and new tools.

  • testing samples of stainless steel pulmaflex springs and pulmaflex (purchasing for both)

  • Pocket springs Dom will start conversation with GL, stainless steel? and perforated non-woven cover.

  • CAD not started

POST WINTER

Aug 3

Early May

NEW

 

 

@Alinta Lim

@dominic.harrison

FLOATING 1977

OUTDOOR

 

No progress, progress on hold

SPRING

Sept 14

Early June

RED

 

 

@Alinta Lim

ISSHO MARBLE OCC. TBL

CASE

 

Gloss or honed finished to be sampled with supplier when GL is back.

Honed finish is DKs preference.

Consider thinner finish on carrara than marquina.

Legs in marble?

Not assigned

-

-

 

 

 

@Alinta Lim

ISSHO ASYMETRICAL DNG TBL

DINING

 

Redesign top shape, DK not happy with current form yet.

DK suggested prototype using the builder from his house, Alinta has asked Michael, awaiting a response from builder.

Not assigned

-

-

NEW

 

 

@dominic.harrison

New organic 2.0 OCC. TBL

CASE

 

New base option to suit Organic Sofa by Zara

Need to follow up Dom on updating. Make marble version.

WINTER

June 15

Early April

RED

 

 

@Alinta Lim

POS FABRIC SAMPLE RACK

N/A

 

Timeline is ASAP, currently fabric samples stored in cupboards.

Alinta is on this and it seems a waste of her time consider design intern on this.

Not assigned

ASAP

ASAP

NEW

 

 


DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT STATUS

RELEASE STATUS

@Sebastian

1977

SOFAS

 

Photoshoot samples to be made in Thailand and TU. Some Leura and white tempest in TU- Sebastian managing with Paul. (Relying on Thailand pattern updates before this can be completed, expected 19/04.)

FLOCK + Production from KFT as well as some Tempest and Leura covers for photoshoot.

Flock- 60 seats white frames completed which all need updates for magic joiners. Single seat is completed. All white frames of corner/seat/chaise are signed off apart from magic joiner. The covers are not yet signed off. Magic joiner solution for flock is angle nailing on, still to test before confirmation. This Thursday we expect an update on when flock can be produced. We will update Michele after that point.

Photoshoot is mid may- photoshoot covers completed by start of May could be

3 weeks late for flock at this stage (with one week Songkran) need update from Frank who is not responding to Seb. Expecting an update on Thursday 20/04

 

Working on product range expansion. White frame of chaise with arm due 3rd May.

  • Chaise with arm (LH and RH) - 3/05 first white frame due

  • Ottoman x 1- next week try to design

  • Curved Corner- next week try to design

 

Design registration disclosure - sebastian this week.

WINTER

June 15

Early April

 

AMBER

@Sebastian

MYCO

CASE

 

@Pearson Bulmer (Unlicensed) to share renders, drawing, BOM. To be released with 1977.

Timelines will be forwarded to Tanya/Michele today.

POST WINTER

5th August

Mid May

AMBER

@Sebastian

OUTDOOR C TABLE

OUTDOOR

 

Vague brief given to Sebastian by DK.

Unassigned

 

 

 

 

@Sebastian

1977 OUTDOOR SOFA

OUTDOOR

 

Drain through fabric outdoor version of sofa

 

 

 

 

AMBER

 

 


 

 

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT STATUS

RELEASE STATUS

 

 

@zara fong

AURA

SOFA

 

Sofa concept flock underway.

@Tanya Rechberger working on patent disclosure form for backrest.

WINTER

June 15

Early April

GREEN

 

 

@zara fong

@Mina Bassilious (Unlicensed)

QUAY CHAIR

DINING

 

Scanning completed? this was to be the guide to CAD for foam molding and steel. Video or the process shared with the team?

Not assigned

-

-

RED

 

 

@Tanya Rechberger

CURVE

SOFA

 

DK confirmed the design direction.

Will transfer to Zara when she has time after Aura and Aura outdoor.

SUMMER?

26/12

24th September

AMBER

 

 

@Tanya Rechberger

JASPER 20th

SOFA

 

FLOCK on the water. Deep Etch/CGI to be scheduled. AI, Product Cards to be done.

VM/Brand to confirm how many packages

AUTUMN

Mar 23

Jan

GREEN

 

 

@Tanya Rechberger

KATO BED

BEDROOM

 

Concept to get started

Not assigned

-

-

RED

 

 

@Tanya Rechberger

KATO V2.0

SOFA

 

Firmer seat option. Drawing done, Phil to get started, Allan to help with sewing.

Not assigned

-

-

RED

 

 

@Tanya Rechberger

QUAY

BAR STOOL

 

Sample received by GL. Next steps?

Not assigned

-

-

RED

 

 

@zara fong

ARC TASK

LIGHTING

ongoing

Zara working on in between Aura sofa

Unassigned

June 15

early April

RED

 

 

@Tanya Rechberger

AMARA CHAIR SOFT

DINING

 

DK completed in GL, need to follow through production

  • Shiyang will send me the details of the attachment process how to achieve in store.

  • The seamline stitching, should we hide the seam to make it less problematic in production with wavy seat? Shiyang will check with patternmaker.

  • airfeight in May for photoshoot?

 

 

 

 

 

 

 

@Tanya Rechberger

LUNA OCCASIONAL INDOOR CHAIR UPDATE

OCCASIONAL

 

Charles wants to update the comfort of the inside of the occasional chair, DK has approved the process start. Trying to get Charles to manage the prototyping process.

 

 

 

 

 

 

 

@Tanya Rechberger

Super soft foam exploration

SOFA GENERAL

 

DK wants to explore using a super soft foam which is high density to replace dacron in some circumstances. Seen it at Cassina.

The team found a foam to replace LT48, rejected because they didn’t understand the purpose of the foam, as a back up supplier. It wasn’t as good as LT48 so they rejected it. Perhaps they misunderstood the brief.

Tanya to ask DK for more details.

 

 

 

 

 

 

 

 


 

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT STATUS

RELEASE STATUS

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

HEIRLOOM CHR

DINING

 

Flock had major issues, outlined in spreadsheet in discussions with Thailand.

If 8 more chairs are made for OP, use as this as the QC update guideline. R & P will follow up with Thailand.

Need to get up to date CAD out of Thailand- with new June.

Leg veneering exploring China and set up QC for GL team to check before shipping.

Plastic injection moulding for legs underway- due

Upholstery foam improvements, R & P will work through foam cut relief ideas with Thailand.

 

 

AUTUMN

Mar 23

Feb

Qty: 26

GREEN

 

@Pearson Bulmer (Unlicensed) @Mina Bassilious (Unlicensed)

HERITAGE FIX TBL

DINING

 

Second and final Sample from UZ home underway, expected to be completed

 

 

POST SPRING

4th November

13th August

GREEN

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

HERITAGE EXT. TBL

DINING

 

GL Making sample now.

Working on multiple avenues at the moment, custom supplier parts and in house version.

Working to tight timeline as updated by Team Ponti here 2023 PROJECT CALANDER Ryan&Pearson.xlsx

POST SPRING

4th November

13th August

AMBER

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

TASMAN CHR

DINING

 

Colour samples not accepted. Frank managing the colour match process with Parrawood (new supplier)

POST AUTUMN

May 4

Mar

GREEN

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

MAGNOLIA TBL

DINING

 

design stage TBA

POST AUTUMN

May 4

Mar

RED

 

@Pearson Bulmer (Unlicensed)

MAX 2

SOFA

 

Project on pause. DK mentioned on Monday Jan 23 what the status was on this project.

Not assigned

-

-

RED

 

@Pearson Bulmer (Unlicensed)

LIGHT TIMBER COLOUR OPTION

 

 

Pearson has ideas on using Ash instead of Red Oak across the board, it’s cheaper and more durable. Pearson will speak to GL team to get some sampling moving along.

 

 

 

 

 

 

ALAN’s Task List

 

Completed

To do

 

Priority Order

Start Date

End Date

 

Completed

To do

 

Priority Order

Start Date

End Date

Alinta

Adelaide TALL Headboard

Status TBA. Need to work on finer details for production

 

MED

 

 

Tanya

Sculptural Sofa

Curved back rest, seat, new version with steel frame

 

HIGH

Ready next week

 

Pearson

CNC machine

Magnolia Table

 

HIGH

 

 

Jordan

Welders (John’s)

Bench (post electricians)

 

MED

 

 

Sebastian

1977

John starting RHC. Allen to make the cover after Tanya’s backrest.

 

HIGH

This week after Organic backrest