Design Team w/c 19/06/23 Meeting Minutes
Date | Week commencing : 19th June 2023 |
|
|
|
|
Project Updates:
GREEN : No more changes
AMBER: Possibility for changes
RED: Will more than likely change
BLUE : New Project
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
|
|
|
|
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | PALLINO PORTABLE | LIGHTING | ongoing | Tarmac will start prototyping new anodised colour options slowly. Colours driven by Michele. Stock will be late, should be confirmed how long the lead time before sale period starts. Tarmac will let Michele know all stock lead times prior to sale start in order for showroom communication. Spare parts- Mina will look into it and compare to other products ask Yoshi. Then enter spare part items into SAP. Hussain is working on it and Mina doing the packaging for this. Need to lengthen the initial lead time as supply is delayed slightly. Will alert Coffey to the fact that we have made sales already. Start prototyping the bronze colour powder coat from Myco. | FLOCK on the water, arrive by Post Autumn Purchase order split into 4 sections, next 3 orders can have colour changes based on market feedback.
| POST AUTUMN | May 1st | Completed | ready for shipment FLOCK production Final production completed | GREEN |
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | FARO PENDANT | LIGHTING | ongoing | Final samples arrived in TU. Product development 100% complete. Aura plug in light create a new master item in system to make the future process simpler. Mina will communicate with Hussain on wiki updates once name confirmed and the process we will follow with timings. Michele working on PO, customer purchase has already started. Decided to go with lead time storing in GL. Mina requested invoice for the PO from Coffey, once we pay they can start production. | WINTER- air freight for flock would be required- and stock for immediate release? | Jun 15 | Production week 26th March | Ideation prototyping design review supplier handover sampling Customer/showroom documentation | GREEN |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | LUNA TIMBER | BARSTOOL |
| Done, counter stool also available now. Will remove from task list. Will airfreight just the one base frame for managers meeting. Spare parts process underway with Hussain. | AUTUMN | Mar 23 | ETA Mar 25 | Done Customer/showroom documentation Counter height in sampling Ready for production | GREEN |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | ELEVATE | HOME-OFF | ongoing | Sample for Elevate is on it’s way to TU. Cecco top sample received. Awaiting rest of product costing from GL. Consider sending Elevate top to new solid timber suppliers. Xiangu leg sample also completed, awaiting costings from Xiangyu and JiaShun. Aesthetic design in solidworks for the leg sleeve is done, Mina will 3D print a leg sleeve for testing once sample from GL arrives. | SUMMER- delayed by DK | Sept 14 | early July | Ideation prototyping design review supplier handover sampling | RED |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | SOLAIR ALU POCKET Accessory (with shade/turn dial shape) | ACCESSORY | ongoing | Samples received from supplier for review - review sent and feedback received, they will implement updates, new sample underway. Still no lead time info. Only black is suitable for deep etch as silver is unlikely to be ready in time. Deep etch team can manage with this as long as they have a silver swatch to use for photoshop. Still not shot. Costing is with Michele, expect Coffey to complete Sample by 23/06 Not suitable to add lighting colour update at this late stage. Looking to see if the supplier has an option to change from ‘cool to warm’ light and can’t implement possibly integrate with Home Automation Systems - this will cost $300K, Dylan need to discuss with SLT. Coffey also possibly has an option but with King App is preference. DK has requested that we don’t do the expensive option, possibly a King Lighting App only which is managed by someone else. Spoke to Coffey re other app options, he had ideas and companies suggested, awaiting info from Coffey to email. Then we can go back to DK with 3 options, no brand, rebrand and Ingenuity. In terms of production readiness for flock is very much PO dependent once we get feedback from pricing. Costings arrived, sent to Michele, but still awaiting tooling (off tool parts) but will let Michele/Damo know about initial costings. | WINTER- even with airfreight will be late due to production lead time. Product sample not completed yet. Push to Post Winter or beyond. Mina to confirm. | - | - | Ideation prototyping design review supplier handover sampling | RED |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | HELIO PENDANT | LIGHTING | ongoing | DK meeting happened, a lot of feedback from DK which has changed the course and brief. Weight is important (consider plastic or reduce alu material). Mechanical vertical movement mech remote operation direction now (single ceiling point), Jordan will start the conversation with Coffey. App integration is dumbed down for cost purposes- see above (Solaire). @jordan will did some work on the modular version to explain to DK the number of wires visible and complexity of electrician set up. Will render one version and send to DK. Idea is individual pendants that magnetise together but are powered separately (electrician joins in ceiling to use one switch on the wall). Need an end cap- put aside until gap in firefly timeline. | DELAYED |
| N/A | Ideation prototyping design review supplier handover sampling | RED |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | ETO DESK V2.0 | HOME-OFF | ongoing | Timber accessories all samples complete. On a boat to TU. Handful of adjustments with the team, Mina managing in a document. TF discussion happened- he’s open to updates, with no1 request being solid timber top. Preferencing new top style. All is resting on pricing for the time being, if solid top can be accommodated then production almost ready. If veneer then will need resampling. Need pricing feedback first. Aluminium charger ring, feedback to supplier has been completed- no issues from supplier and Tom is happy. | paused | June 15 | early April | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | ETO TBL LAMP | HOME-OFF | ongoing | Sample arrived, 95% sample, assessment by Tom required and Tanya talk to DK. Oak colour is wrong. Update with Tom completed, Coffey will resample and answer questions. With Coffey. Mina need to send the lights to Coffey. | paused- see above | June 15 | early April | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | ETO TASK LIGHT | HOME-OFF | ongoing | Sample arrived, 95% sample, assessment by Tom required and Tanya talk to DK.- battery missing. Need to make it a non-tipping product after Tom assesses it. Oak colour is wrong. Update with Tom completed, Coffey will resample and answer questions. Need to send the lights abck to Coffey again to save time on re prototyping. | paused- see above | June 15 | early April | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | LUNA MESH BARSTOOL & COUNTER STOOL | OUTDOOR |
| BAR STOOL: Sample reviewed by CW. The new new sample looks more accurate, but awaiting CW to sit on the sample before starting tooling.
COUNTER STOOL: Shorter frame approved and will be incorporated into Timber stool, same base concept used for mesh stool. Two stools have been air freighted for photography. | POST WINTER!- Spring? | Aug 3 | 16th May | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | LUNA UPH | BARSTOOL & COUNTER STOOL | ongoing | BARSTOOL & COUNTER STOOL: Dome consideration to add to seat top. Cut dome in production for flock. Flock on the way to showrooms, Mina working on spare parts. Mina to look at updating tooling to include the dome. Ask Shiyang to 3D scan the new seat with dome in it so that we can update the foam tooling mould. | POST WINTER | Aug 3 | 16th May | GREEN |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | ELEMENT EXTENSION TBL | OUTDOOR | Ongoing | New concept. DK to approve concept/range plan. Waiting on Tanya looking over the brief. (Need to discuss with DK.) Note: design direction from DK is with a D end. Extension mech spec sheet needed by the supplier. Mina do concepts by next week to review. Set meeting to go through it Wednesday 26th April. Need to consider whether it’s important for next years outdoor release. Tanya to find out if we still want it as a priority for next year, then need to get Mina started on it slowly now. | Not assigned- paused. Need proper brief. |
|
| NEW |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | DESK CHAIR | HOME-OFF | ongoing | Initial prototype with timber back has been reviewed by DK - feedback was works well with ETO desk. | Not assigned- paused until time allocation completed. |
|
| NEW |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | LIGHTING GALLERY | VM | stopped | Michele spoke to Jackie/Vickie/Emily on requirements Michele feels that in store over product display is a better solution and feasible post Michael discussion. Michele will discuss with DK if he’s in agreement. Design of gallery on pause until DK conversation as may not be required. Not a project as company agreed to install into ceiling. | Not Assigned | - | - | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | DIRECTORS CHAIR | OUTDOOR |
| Documentation shared to Shiyang, tooling and BOM cost due from Shiyang 23/06. Cross brace costed in stainless and Aluminium. Sling cover sample 1 completed. Highlighted comfort issues in frame form. Zipper was used need to test strength, also fabric stretched. Highlighting that we need stronger batylene, or layer up with stronger fabrics quilted. Plan to go to prototype tooling ASAP (after 1 month extrusion tooling ready). This then needs to tested in press tools, with aluminium bounce back would expect issues, but minimal 2 weeks for tweaking. This is with press tool starting at same time as extrusion tooling. Lounge chair solidworks completed and sent to Shiyang to sample after normal chair. Even minimising the sling cover prototyping time (1 week) we are in early September for production start. Even if we start tooling after quoting immediately, we are still mid July for off tool components. Need to work out using off tool components all the small mechs at this point as well. Even if we buy off the shelf extrusion, we need to make 4 weeks for press tool + 2 weeks for tweaking. Mina not interested in weeks of workshop time to make the photoshoot items which will not be useful for product release and will slow that down. A little bit of downtime while awaiting tooling completion. Cheap mesh sample- Mina is currently testing the mesh with 150kg to test if stretch and seams are suitable. Order the extrusion tooling after quotations returned. CAPEXs will need to be raised. If Mina has time prior to briefing of new projects he will start the form modelling of the counter version. | Unassigned as yet | Aug 3 | Early May | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | FIREFLY- outdoor lantern | OUTDOOR |
| Brief - portable, charging, ip rated, fabric integration for softer feel. Concept stage- conversation with Tanya once prototypes are completed. Brief update permanent outdoor version, so needs higher IP rating. DK confirmed wants plug in charging. Coffey has a lot of experience with outdoor lights, will @Jordan Ruchalski (Unlicensed) Finish 3D print 30/05 and big goal to have a form idea which DK accepts by 2/06. Testing other quick texture ideas in solidworks. Form ready for production 19/06 to meet with Coffey 20/06 (Jordan meet today) DK meeting 31/05- charging near house rather than in garden space. Plug in charger. Start with smooth finish consider adding ribs/texture down the line. Make the shapes more mix and match between the sizes (squat and elongated). Upmarket sound solution to incorporate in (ask Coffey). Wifi compatibility decided due lower cost, as well as fixed on/off switch possibly with Pallino operation capabilities. Looking to see if the supplier has an option to change from ‘cool to warm’ light and can’t implement possibly integrate with Home Automation Systems - this will cost $300K, Dylan need to discuss with SLT. Coffey also possibly has an option but with King App is preference. DK has requested that we don’t do the expensive option, possibly a King Lighting App only which is managed by someone else. Spoke to Coffey re other app options 20/06 (Mina will ask), he had ideas and companies suggested, awaiting info from Coffey to email. Then we can go back to DK with 3 options, no brand, rebrand and Ingenuity. | Post spring | Aug 3 | Early May | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | BAR CABINET | CASED GOODS |
| Commercialisation stage of this product to be considered with Michele first. It has been started, Priorities need to be defined. | Deprioritised |
|
|
|
|
|
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | CASED GOODS | CASED GOODS |
| Commercialisation stage of this product to be considered with Michele first. | Deprioritised |
|
|
|
|
|
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | HIGH-LOW floor light | LIGHTING |
| Commercialisation stage of this product to be considered with Michele first. | DePrioritised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
|
|
|
|
| |||||||||
|
|
|
|
| ||||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE |
| STATUS |
|
|
|
|
|
@Alinta Lim @dominic.harrison | ADELAIDE | BEDROOM |
| Injection moulding completed. Veneering pricing underway. Veneering samples fading too fast compared to GL samples, Dylan finding out if issues. Alinta will follow up Dylan again for standards. Bed instructions are critical. Dom will do a back up video but possibly CS can handle the video. Packaging sent over. On hold for time being until design finalised again. Working on extending sizing rollout after flock. California King- not for US flock, but will be offered- GL for mattress, and other beds. SAP preparation underway. On hold for time being until design finalised again. Feasibility of corner has been proven, just working on producing it neatly. Top of bed technique, needs to be decided based of Cabana best solution. 8 weeks for spring production readiness. Inner frames- 35x20 tube was strong enough. Pins to connect the two frames together- need to test, Alinta to manage, trial this week. Alinta jump test completed- pass on to James to prove it. Mosquito net machine sewing tension still not right, pattern will need to be checked after tension issues solved.
|
|
| WINTER
| June 15 | Early April. Qty: 15 pieces | AMBER |
|
|
| |
@Alinta Lim | DUNE | CASE |
| DK approved current leg design and low style (not in line with mattress height), Alinta will expand the range as necessary and work with JiaShun on further updates. (Draw mech etc) Attachment method redesign. Ask James about testing criteria. | WINTER
| June 15 | Early April. Qty: 15 pieces | RED |
|
|
|
|
| |
@Alinta Lim @dominic.harrison | CABANA | OUTDOOR |
| Roof structure- redesign plan B solution underway, requires a cut out, laser welding might work, but might not- awaiting Wichai. For photography, wont see that area so send any option. Sun lounge frame for GL - GL has made first sample, not powder coated. Thailand is making sample for photoshoot. Cabana seat cushion reticulated seat insert completed cover sample to do this week. Powder coat samples has been powder coated in a satin finish but doesn’t match GL so purchasing to keep trying to match GLs over time. @Alinta Lim will check with James P. about whether the TH outdoor foam is suitable. In progress- Gam couldn’t get all of the details as requested, Alinta to follow up James. for handover to purchasing. Knock-ins will be tooled in China- Shiyang is okay on that. 2 of 3 confirmed and approved by Alinta. 3rd one is the roof cap. Photography will be 3D print. Frame design solved just production of frame, to be solved which has lot to do, Alinta involved in following up. Roof fabric- Alinta organised to have it airfreighted over for photoshoot.
|
|
| POST WINTER
| Aug 3 | Early May Qty: TBA | RED |
|
|
| |
@Alinta Lim | GAZEBO | OUTDOOR |
| Scope stage, new project suggestion by DK | Not assigned | - | - | NEW |
|
|
|
|
| |
@Alinta Lim @dominic.harrison | GARDEN CHAIR + OLIVE TABLE | OUTDOOR |
| Making cover with Allan- update 2.0 is waiting for Allan, stainless steel chair has arrived and is surprisingly comfortable even without cover. | POST WINTER | Aug 3 | Early May Qty: TBA | RED |
|
|
|
|
| |
@Alinta Lim @dominic.harrison | PLATELETT TABLE | OUTDOOR |
| Adjustable height with manual turning mech. Material selection to be discussed with DK.
| POST WINTER | Aug 3 | Early May | RED |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
@dominic.harrison | Plateau Outdoor | OUTDOOR |
|
| SPRING | Aug 3 | Early May | AMBER |
|
|
|
|
| |
@Alinta Lim | ISSHO MARBLE OCC. TBL | CASE |
| Gloss or honed finished to be sampled with supplier when GL is back. Honed finish is DKs preference. Consider thinner finish on carrara than marquina. Legs in marble? | Not assigned | - | - |
|
|
|
|
|
| |
@Alinta Lim | ISSHO ASYMETRICAL DNG TBL | DINING |
| Redesign top shape, DK not happy with current form yet. DK suggested prototype using the builder from his house, Alinta has asked Michael, awaiting a response from builder. | Not assigned | - | - | NEW |
|
|
|
|
| |
@dominic.harrison | New organic 2.0 OCC. TBL | CASE |
| New base option to suit Organic Sofa by Zara Need to follow up Dom on updating. Make marble version. | WINTER | June 15 | Early April | RED |
|
|
|
|
| |
@Alinta Lim | POS FABRIC SAMPLE RACK | N/A |
| Timeline is ASAP, currently fabric samples stored in cupboards. Alinta is on this and it seems a waste of her time consider design intern on this. | Not assigned | ASAP | ASAP | NEW |
|
|
|
|
| |
@Alinta Lim | SPEAKER BRACKET UNIVERSAL |
|
| Universal bracket after Adelaide Bed | Not assigned | Not assigned |
|
| NEW |
|
|
|
|
|
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@Sebastian | 1977 | SOFAS |
| Magic joiners are not functioning without frame alterations, we think investigating velcro joiners is out because of DK. Ratchet foot cup/leg loop solution and the steel extra screwing into the frame underside. Ordered rubber bands and leg velcro joiners for testing, hopefully one of these options works out as a temp flock solution at the very least. Currently the cup is underway but off the shelf solution is the priority. Stefan understands the issue on the legs lining up issue and he needs to play around with the CAD as we can’t open the newer files. Live project tracker has been put together by Seb, Wichai needs to populate and then we will have access. Working on product range expansion. White frame of chaise with arm due 3rd May. Urgently working on Accordian style love seat first. Still awaiting feedback from Frank.
Design registration disclosure -sent with all products except the ottoman. Cylindo: Hussain has everything from Seb and is on his plate. Deep etched images- Seb has updated the deep etch drawing. Future point- Liaise with James Pudney on load testing/quality. | WINTER | June 15 | Early April
| AMBER | |
@Sebastian | MYCO | CASE |
| Production finished, flock underway. Spare parts should be completed, Seb will double check. Will show at managers meeting. Seb to locate the tables. Quality testing underway with James P. | POST WINTER | 5th August | Mid May | AMBER | |
@Sebastian | OUTDOOR C TABLE | OUTDOOR |
| Vague brief given to Sebastian by DK. Brief which will start with investigations, can Seb start with it in between other projects, Seb will set that meeting. On peripheral. | Unassigned |
|
|
|
|
@Sebastian | 1977 OUTDOOR SOFA | OUTDOOR |
| Drain through fabric outdoor version of sofa.
|
|
|
|
| AMBER |
@Sebastian | POOL FURNITURE | OUTDOOR |
|
|
|
|
|
|
|
@Sebastian | ARC FLOOR LIGHT | LIGHTING |
|
|
|
|
|
|
|
| Outdoor Sofa |
|
| Pipeline projects, pitching ideas as per DK convo |
|
|
|
|
|
| Indoor Occasional Chair |
|
| Pipeline projects, pitching ideas as per DK convo |
|
|
|
|
|
|
| ||||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
|
|
---|---|---|---|---|---|---|---|---|---|---|---|
@zara fong | AURA | SOFA |
|
| WINTER | June 15 | Early April | GREEN |
|
| |
@zara fong | Aura Outdoor | OUTDOOR |
|
|
|
|
|
|
|
|
|
@zara fong | AURA FLOAT | FLOAT | PAUSE |
|
|
|
|
|
|
|
|
@zara fong | ARC TASK | LIGHTING | ongoing |
| Unassigned | June 15 | early April | RED |
|
| |
@zara fong
| QUAY CHAIR | DINING |
| Scanning completed? this was to be the guide to CAD for foam molding and steel. Video or the process shared with the team? Discuss with DK regarding the Quay Chair foam moulding already completed. | Not assigned | - | - | RED |
|
| |
@zara fong | QUAY BAR | BAR STOOL |
| Sample received by GL. Next steps?
| Not assigned | - | - | RED |
|
| |
@Tanya Rechberger @zara fong | CURVE | SOFA |
| DK confirmed the design direction. Will transfer to Zara when she has time after Aura and Aura outdoor. Update brief, post Milan- run past DK. | SUMMER? | 26/12 | 24th September | AMBER |
|
| |
@Tanya Rechberger | JASPER 20th | SOFA |
| FLOCK on the water. Deep Etch/CGI to be scheduled. AI, Product Cards to be done. VM/Brand to confirm how many packages. Enter new SAP code for Curve with light, and new smart pocket. Changeover this week- go and check the lights. | AUTUMN | Mar 23 | Jan | GREEN |
|
| |
@Tanya Rechberger | KATO BED | BEDROOM |
| Concept to get started. Don’t have a brief yet. | Not assigned | - | - | RED |
|
| |
@Tanya Rechberger | KATO V2.0 | SOFA |
| Firmer seat design completed. Enter into SAP? | Not assigned | - | - | RED |
|
| |
@Tanya Rechberger | AMARA CHAIR SOFT | DINING |
| DK completed in GL, need to follow through production
|
|
|
|
|
|
|
|
@Tanya Rechberger | LUNA OCCASIONAL INDOOR CHAIR UPDATE | OCCASIONAL |
| Charles wants to update the comfort of the inside of the occasional chair, DK has approved the process start. Trying to get Charles to manage the prototyping process. Have found chair for using on sampling. @Tanya Rechberger to bring up to design area. Shiyang searching for latest Luna indoor chair file to pass on to CW. |
|
|
|
|
|
|
|
@Tanya Rechberger | Super soft foam exploration | SOFA GENERAL |
| DK wants to explore using a super soft foam which is high density to replace dacron in some circumstances. Seen it at Cassina. The team found a foam to replace LT48, rejected because they didn’t understand the purpose of the foam, as a backup supplier. It wasn’t as good as LT48 so they rejected it. Perhaps they misunderstood the brief. Tanya to ask DK for more details. @Tanya Rechberger discuss with Michele and DK re the designer and priority of DKs new sofa design. Also ask MD for foam sample from Italy if possible. |
|
|
|
|
|
|
|
| ||||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
|
---|---|---|---|---|---|---|---|---|---|---|
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HEIRLOOM CHR | DINING |
| Plastic injection moulding for legs have not been sent from GL, PO issued today. Production starting on the chairs today- sign off from DK was yesterday. Gam made some updates to the patterns including automotive closure. Requested packaging testing, awaiting feedback. Push again for ITSA test, drop tests have failed apparently but Ryan doesn’t have up to date information. Die lines of chair packaging with marketing at the moment. DK sent a video of the product and some images, Ryan will try to Beta photoshop app for managers meeting. Assembly instructions- air freight chair sample from TH for Adam to create instructions. | AUTUMN | Mar 23 | Feb Qty: 26 | RED |
| |
@Pearson Bulmer (Unlicensed) @Mina Bassilious (Unlicensed) | HERITAGE FIX TBL | DINING |
| Second and final Sample from UZ home underway, we pivoted them away from this priority over to extension table. Could possibly review the required updates on an ext. table. TBC closer to date.
| POST SPRING | 4th November | 13th August | AMBER |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HERITAGE EXT. TBL | DINING |
| GL Making sample now. Working on multiple avenues at the moment, custom supplier parts and in house version. DK pushed for in house again, Shiyang has big concerns which have been communicated with DK. We will push ahead in any case and Cecco make a sample of timber components. Working to tight timeline as updated by Team Ponti here 2023 PROJECT CALANDER Ryan&Pearson.xlsx DK signed off on 90 degree timber veneer and on table mechanisms. Shengsheng sample is quite good- but Ryan is awaiting more detailed feedback in the report before we can commit to the product for flock. Expect back 26/06. Had some supplier (UZ) hiccups on timeline issues currently looking at 3-4 weeks late for UK, CA- 2-3 weeks late, VicQld 1-2 weeks late. Will assess again closer to the and do our best to claw time back. UZ a bit disappointing but Shengshen is promising so far. The timber work is decent. Motor addition has been put on hold, working on gas pop up lift sample. Ryan to work on the concept alongside Shen for fastest solution to be found. Latest quotes from UZ home for manual extension table are walnut $2974 AUD and $2345 AUD for Congo/Smoked oak. Shangsheng is approx. $400 cheaper for walnut version. In GL- installation of mechanism - Ryan will start Shiyang on this. Ryan will speak to Shiyang about the learnings from the assembly of the Shengshen sample. | POST SPRING | 4th November | 13th August | AMBER |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | TASMAN CHR | DINING |
| Yabo sample is underway, DK has approved with improvements to the seat inlay. GL to send a steel seat frame to Yabo. Plan to have a seat insert manufactured in GL and assembled in Customers home. +/- 3mm tolerance on the chairs is achievable which will assist in this process. Aware it’s very risky and will be putting a lot of work into minimising risk in order to get max benefit. | SUMMER | May 4 | Mar | AMBER |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | MAGNOLIA TBL | DINING |
| design stage TBA Samples with suppliers soon. DK has approved to go ahead with suppliers (change timber horizontal to steel tube). Details and drawing to work through, requote with steel. -Consider as an extension table | POST AUTUMN | May 4 | Mar | RED |
| |
@Pearson Bulmer (Unlicensed) | MAX 2 | SOFA |
| Project on pause. DK mentioned on Monday Jan 23 what the status was on this project. | Not assigned | - | - | RED |
| |
@Pearson Bulmer (Unlicensed) | LIGHT TIMBER COLOUR OPTION/ Master stain update |
|
| Trying to create King master colours across the board, as well as new lighter colour. Pearson has ideas on using Ash instead of Red Oak across the board, it’s cheaper and more durable. Pearson will speak to GL team to get some sampling moving along. Cecco is remaking some samples, Oil based was used instead of water based, so needed to redo. Fingers crossed it will be faster this time (not 6 weeks like last time). Only Cecco currently looking at light timber option as they are our main solid timber supplier and they use the best water based finished. Veneer sample master underway with one supplier currently. Pearson will follow up. GL purchasing team assisting with this to try to bring all finishes into line together to match colours better. UZ samples underway to ensure timber finishes from them match.
|
|
|
|
|
|
|
| NEW SOFT FLEX ARM SOFA |
|
| @Tanya Rechberger to call DK and confirm the project kick off with Ryan and Pearson, Pearson holiday starts next week. |
|
|
|
|
|
|
ALAN’s Task List
| Completed | To do |
| Priority Order | Start Date | End Date |
---|---|---|---|---|---|---|
Alinta |
|
|
|
|
|
|
Tanya |
|
|
|
|
|
|
Pearson |
|
|
|
|
|
|
Jordan |
|
|
|
|
|
|
Sebastian |
|
|
|
|
|
|