Design Team w/c 20/02/23 Meeting Minutes
Date | Week commencing : 20th February 2023 |
Attendees | @Alinta Lim @dominic.harrison @zara fong @Tanya Rechberger @Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) @Michele DiBlasio (Unlicensed) |
Mtg Pending | @Pearson Bulmer (Unlicensed) @Ryan McGoldrick @Sebastian |
Project Updates:
GREEN : No more changes
AMBER: Possibility for changes
RED: Will more than likely change
BLUE : New Project
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | PALLINO PORTABLE | LIGHTING | ongoing | FLOCK on the water, arrive by Post Autumn Purchase order split into 4 sections, next 3 orders can have colour changes based on market feedback. Tarmac will start prototyping new colour options slowly. Longer lead time stores will be late. | POST AUTUMN | Feb 10 | ETA April 17th | ready for shipment FLOCK production Final production completed | GREEN |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | AURA PENDANT | LIGHTING | ongoing | Final samples not arrived in TU. Product development 100% complete. Package design done. Supplier to sample the packaging now. Supplier to send the sample to TU - ASAP. On the way. Supplier has only our old Natural Oak colour and will send sample. | WINTER | Jun 15 | Production week 26th March | Ideation prototyping design review supplier handover sampling | GREEN |
@Mina Bassilious (Unlicensed) | LUNA TIMBER | BARSTOOL |
| 1st batch of FLOCK on track for target date. 2 per store. Bar stool height on the way, CAD Work for counter stool is completed and sampling in process in GL. | AUTUMN | Mar 23 | ETA Mar 25 | Done Counter height in sampling | GREEN |
@Mina Bassilious (Unlicensed) | ELEVATE | HOME-OFF | ongoing | Prototype in progress at GL. Components being sourced. Test criteria shared by Test Lab (MTS)
GL to continue with prototyping. More focus on the test criteria. R&D resources needed to get this project moving. Le Shu making prototype now. Cecco top costing complete. Awaiting rest of product costing from GL. | SPRING | Sept 14 | early July | Ideation prototyping design review supplier handover sampling | RED |
@Mina Bassilious (Unlicensed) | SOLAIR ALU POCKET Accessory (with shade/turn dial shape) | ACCESSORY | ongoing | Samples received from supplier for review - review document underway. Only black only is suitable for deep etch as silver is unlikely to be ready in time. Deep etch team can manage with this as long as they have a silver swatch to use for photoshop. Package design done- in sampling with supplier. Name to be given - SOLAIR Not suitable to add at this late stage. Looking to see if the supplier has an option to change from ‘cool to warm’ light and can’t implement possibly integrate with Home Automation Systems (speak with Tony on DNC on Cloud) | Not assigned | - | - | Ideation prototyping design review supplier handover sampling | AMBER |
@Mina Bassilious (Unlicensed) | HELIO PENDANT | LIGHTING | ongoing | Waiting on complete sample to sent to TU. Deep Etch /lifestyle shoot has been scheduled. Tentatively booked for Late March. Product arriving this week. CGI is potentially an option but Kirsty to confirm - not required at this stage. | WINTER | June 15 | N/A | Ideation prototyping design review supplier handover sampling | AMBER |
@Mina Bassilious (Unlicensed) | ETO DESK V2.0 | HOME-OFF | ongoing | Components still at sourcing and not sampled. This project is moving TOO SLOWLY for Mina. March 10 tooled part to be received. We are thinking it is best to launch with all accessories. So push out to WINTER campaign. | paused | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | ETO TBL LAMP | HOME-OFF | ongoing | Waiting on complete sample - not urgent | paused- see above | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | ETO TASK LIGHT | HOME-OFF | ongoing | Waiting on complete sample
| paused- see above | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | ARC FLOOR (Adjust) | LIGHTING | ongoing | DK feedback was very positive and greatly appreciated. 2nd prototype starting this week for DK request to eclipse from the base. Tooling will be costly but will prototype anyway. DK approved but let’s have the conversation with DK again on form. Pricing of tapered component if worthwhile Michele will look into and get back to us 21st Feb. Double illumination for up/down + dimming + app integration | WINTER | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | ARC TASK | LIGHTING | ongoing | Add-on for Zara’s Organic Sofa A lot of above issues in this product too. | WINTER | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | LUNA MESH BARSTOOL & COUNTER STOOL | OUTDOOR |
| BAR STOOL: Sample reviewed by CW. Mina/Tony to discuss testing/seat heights. The tooling done on the stool is incorrect, this needs to be addressed with GL & fabricator. A whole new seat form has been developed with updates- prototyping request with soft tool (limited use). Find out info on pricing and timing of soft tool- Mina. COUNTER STOOL: Mina has complete engineering DWG. Seat pad needs to be re-considered- after sample off soft tool comes back successful.
| POST WINTER | Aug 3 | Early May | GREEN | |
@Mina Bassilious (Unlicensed) | ELEMENT EXTENSION TBL | OUTDOOR | Ongoing | New concept. DK to approve concept/range plan. Note: design direction from DK is with a D end. Extension mech spec sheet needed by the supplier. | Not assigned- paused. Need proper brief. |
|
| NEW | |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | DESK CHAIR | HOME-OFF | ongoing | Initial prototype with timber back has been reviewed by DK - feedback was works well with ETO desk. | Not assigned- paused until time allocation completed. |
|
| NEW | |
@Mina Bassilious (Unlicensed) | LUNA UPH | BARSTOOL & COUNTER STOOL | ongoing | BARSTOOL & COUNTER STOOL: Tooling not yet started yet. Tooling start 27th Feb. Have to shift to post winter- want to have photography sample by mid May- Air freight an extra preproduction flock sample for this. COUNTER STOOL: Mina has complete engineering DWG for legs. Needs to be sampled to understand dynamic of stability.
| POST WINTER | Aug 3 | 16th May | GREEN | |
@Mina Bassilious (Unlicensed) | LIGHTING GALLERY | VM | ongoing | Michele spoke to Jackie/Vickie/Emily on requirements Michele feels that in store over product display is a better solution and feasible post Michael discussion. Michele will discuss with DK if he’s in agreement. Design of gallery on pause until DK conversation as may not be required. | Not Assigned | - | - | RED | |
@Mina Bassilious (Unlicensed) | DIRECTORS CHAIR | OUTDOOR |
| Brief from Alinta completed, CAD and tooling development to be shared with Mina. Mina need discussion with Tanya re design and also team priorities. | POST WINTER | Aug 3 | Early May | RED | |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | FIREFLY- outdoor lantern | OUTDOOR |
| Brief - portable, charging, ip rated, fabric integration for softer feel. Concept stage- conversation with Tanya once prototypes are completed. Jordan to look into mozzie repellant incorporation. | POST WINTER | Aug 3 | Early May | RED | |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | BAR CABINET | CASED GOODS |
| Commercialisation stage of this product to be considered with Michele first. It has been started, Priorities need to be defined. | Deprioritised |
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | CASED GOODS | CASED GOODS |
| Commercialisation stage of this product to be considered with Michele first. |
|
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | HIGH-LOW floor light | LIGHTING |
| Commercialisation stage of this product to be considered with Michele first. | Prioritised |
|
|
|
|
| |||||||||
| |||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE |
| STATUS |
@Alinta Lim @dominic.harrison | ADELAIDE | BEDROOM |
| CAPEX approval for tooling status to be confirmed by KFT - Frank says approved. Proceeding- die casting underway, not worried. Aluminium extrusion off tool sample due this week. Injection moulding (family tooling) underway, on track. Due 31st march Veneering pricing MUCH TOO HIGH. Veneering samples fading too fast compared to GL samples, Alinta to find out GL finishes and TH finishes and find difference to improve TH. Pricing is approved by DK and all already okay despite high initial pricing. GL prototyping bed base, on track Allan prototyping bedhead- finish 21/02/22 Bed instructions are critical. Packaging still needs to be completed by Dom/Alinta and QC checks instigated. | WINTER
| June 15 | Early April. Qty: 15 pieces | AMBER | |
@Alinta Lim | DUNE | CASE |
| Base/Leg design to be resolved. Work on new leg concepts over the next few weeks. | WINTER
| June 15 | Early April. Qty: 15 pieces | RED | |
@Alinta Lim @dominic.harrison | CABANA | OUTDOOR |
| Working with Dylan on these samples. Still to design: - Corner caps, hooks, shade system, sun lounge frame- about to start prototyping. Powder coat samples not yet received from Thailand. Team Dolce will consider the photoshoot readiness and what costs would be involved and bring back next week. Costs provided need to push the go button.
| POST WINTER
| Aug 3 | Early May Qty: TBA | AMBER | |
@Alinta Lim | GAZEBO | OUTDOOR |
| Scope stage, new project suggestion by DK | Tentaitive Spring release | - | - | NEW | |
@Alinta Lim @dominic.harrison | GARDEN CHAIR | OUTDOOR |
| KFT to source the right tools for manufacture, otherwise this needs to be sourced by GL. Waiting on images from KFT of prototype. Still waiting. Consider target pricing- Team Dolce to try for BOM costing from TH, Michele has info, awaiting response. Awaiting indicative costings from TH on stainless, will follow up this week. | POST WINTER | Aug 3 | Early May Qty: TBA | GREEN | |
@Alinta Lim @dominic.harrison | PLATELETT TABLE | OUTDOOR |
| Adjustable height with manual turning mech. Material selection to be discussed with DK.
| POST WINTER | Aug 3 | Early May | AMBER | |
@Alinta Lim | DIRECTOR CHAIR | OUTDOOR |
| Review with DK to understand his requirements on construction.
| POST WINTER | Aug 3 | Early May | AMBER | |
|
|
|
|
|
|
|
|
|
|
@Alinta Lim @dominic.harrison | FLOATING 1977 | OUTDOOR |
| No progress, progress on hold | SPRING | Sept 14 | Early June | RED | |
@Alinta Lim | ISSHO MARBLE OCC. TBL | CASE |
| Gloss or honed finished to be sampled with supplier when GL is back. Honed finish is DKs preference. Testing in GL now. Consider thinner finish on carrara than marquina. Legs in marble? | Not assigned | - | - |
| |
@Alinta Lim | ISSHO ASYMETRICAL DNG TBL | DINING |
| Redesign top shape, DK not happy with current form yet. Awaiting plans from Michael. | Not assigned | - | - | NEW | |
@dominic.harrison | New organic 2.0 OCC. TBL | CASE |
| Working on preso for DK | WINTER | June 15 | Early April | RED | |
@dominic.harrison | KATO OUTDOOR | OUTDOOR |
| Working on preso for DK | Post Winter/Spring | Aug 3 | Early May | NEW | |
@Alinta Lim | POS FABRIC SAMPLE RACK | N/A |
| Timeline is ASAP, currently fabric samples stored in cupboards. Alinta is on this and it seems a waste of her time consider design intern on this. | Not assigned | ASAP | ASAP | NEW | |
@Alinta Lim @dominic.harrison | OLIVE TABLE | OUTDOOR |
| GL Product, 1800 table entered into SAP- Assets completed (not Cylindo, but check on the deep etch if completed or not.) Find out from Michele which other rectangle sizes are required. (Console option.) Alinta will email Michele next week. | POST WINTER | Aug 3 | Early May Qty: TBA | GREEN | |
@Alinta Lim | OLIVE TABLE INDOOR | DINING |
| Range extension of the outdoor Olive. Premium indoor such as marble or stone look , powder coated legs, could try veneering but adds cost and wont sit as well within the King range. Would be a quick win. | ? |
|
|
|
|
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@Sebastian | 1977 | SOFAS |
| Photoshoot samples to be made in TU. FLOCK + Production from KFT Revision to frame and specification of textile/colour offering in progress Corner sample, DK didn’t get the understanding from planning (or changed his mind) and now this is adding time to the process. Sebastian will modify the existing corner prototype to fudge the new idea. | POST AUTUMN
| May 4 | Early April
| AMBER | |
@Sebastian | MYCO | CASE |
| @Pearson Bulmer (Unlicensed) has shared renders, drawing, BOM. To be released with 1977 Sent to Thailand, timber colour being sourced. Knock-in is being quoted (design complete), no feedback yet. Awaiting feedback on powder coat colours. | POST AUTUMN | May 4 | Early April | AMBER |
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@zara fong | ORGANIC | SOFA |
| Concept prototype in TU started. GL to prototype by early March (reduced seat depth version) Task light briefed to @Mina Bassilious (Unlicensed) Storage frame to be made in prep for storage mech resolve. Arm/backrest done - Allan to prepare the cover so DK can review the ‘fabric ripple’ VM/Brand briefed. Fabric selection made for FLOCK. Sebastian briefed on a organic shape floor rug | WINTER | June 15 | Early April | RED | |
@zara fong @Mina Bassilious (Unlicensed) | QUAY CHAIR | DINING |
| Scanning completed? this was to be the guide to CAD for foam molding and steel. Video or the process shared with the team? | Not assigned | - | - | RED | |
@Tanya Rechberger | CURVE | SOFA |
| DK confirmed the design direction. This week focus is CAD. Early Feb John/Phil to prototype | WINTER | June 15 | Early April | RED | |
@Tanya Rechberger | JASPER 20th | SOFA |
| FLOCK on the water. Deep Etch/CGI to be scheduled. AI, Product Cards to be done. VM/Brand to confirm how many packages | AUTUMN | Mar 23 | Jan | GREEN | |
@Tanya Rechberger | KATO BED | BEDROOM |
| Concept to get started | Not assigned | - | - | RED | |
@Tanya Rechberger | KATO V2.0 | SOFA |
| Firmer seat option. GL prototype completed and DK approved, completing BOMS now. Need to confirm which fabric/size for DK’s Maianbar house. | Not assigned | - | - | GREEN | |
@Tanya Rechberger | QUAY BAR STOOL | BAR STOOL |
| Sample received by GL. Awaiting quality to determine testing standards. | Not assigned | - | - | RED |
| ||||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
|
---|---|---|---|---|---|---|---|---|---|---|
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HEIRLOOM CHR | DINING |
| Allan to complete the final pattern & AIR to KFT. Screen printed legs to have AW + SO finish by KFT supplier. Frank managing closely the colour match Allan prepping patterns for SAP meterage in GL. Awaiting DFM for plastic leg tooling from china, not started yet, Consider trialing plastic leg sleeve tooling with fast turnaround new TH supplier. Long lead time required for chairs in stores, have said 12 weeks plus. Injection lugs for connection point of legs to chair and foot cap still in quotation process, pushing them, temp flock solutions are in play now. Timber veneer issues in TH. Foam structure has gluing inconsistencies. Need to be sorted and creates pattern issues. Seats fine! End of May ready for customer production out of TH. Goalposts shifting at all times on this product. Week of 27th Feb- working on design updates and user manuals for this product. Needed more communication with designers from Ji about the product through the process, this was communicated with Ji after so hopefully will not happen after. |
| AUTUMN | Mar 23 | Feb Qty: 26 | GREEN | |
@Pearson Bulmer (Unlicensed) @Mina Bassilious (Unlicensed) | HERITAGE FIX TBL | DINING |
| FLOCK underway. AW and AO timber sourced. Colour staining to be redone with GL QC present. Balance of FLOCK to be done by Cecco ETA June/July. UZ sample due end of this week, reasonable option for flock and customer orders after proving sample. Considering investigating new suppliers. Investigate Indonesian suppliers with Michele. Yoshi working on supplier agreements for quality control. Where do we want to produce this table? Trying suppliers everywhere. UZ table sample complete end of March, they are the only supplier so far to commit to making the full range including 3m table. The most promising in a sea of unpromising suppliers so far. If all goes to plan could be in production (rest of) flock mid May, with customer orders producing July. Low fi user manuals for Heritage fixed table for showrooms from 27th Feb. First Cecco table sample (1.8m due mid March) after that consider sampling other sizes, no commitment from them. | AUTUMN | Mar 23 | Feb 15 QTY: 5 | GREEN |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HERITAGE EXT. TBL | DINING |
| Some extension mech’s have arrived, prototyping to start in TU. Cecco is the chosen supplier for FLOCK and production.- JUST NO, Awaiting more mechanisms, as first mechs received were not up to our standards for suitability. Still need to source a mech that can be used for 2.4m to 3m- this is holding a much heavier weight. Making a new mech is a much longer tooling and development process. (1.8s and 2.4s are way more popular in our sales history, but DK needs to confirm whether 2.4m to 3ish. We think DK will be happy with either option at the moment.) Extension table needs more testing after design completion to make it customer ready (balance and compliance testing) due to nature of moving parts. 2nd extension table sample (using current mechanisms not best) plan to completed by Friday 10th March. This can be interacted with but not expecting to be anywhere final sample.
| WINTER | June 15 | April | RED |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | TASMAN CHR | DINING |
| Colour samples not accepted. Frank managing the colour match process with Parrawood (new supplier). Tasman chair can be ready prior to Magnolia Table- is this wanted prior to Magnolia table release. Move project to GL, nearly completed. Tasman possibly can be ready for Winter, but very tight turnaround, (Magnolia table absolutely not ready). Should we move this to China? | POST AUTUMN | May 4 | Mar | GREEN |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | MAGNOLIA TBL | DINING |
| design stage TBA Just need to stain black, meet with DK on Monday to present. (1 day) Design drawings to be completed afterwards and sent to supplier for quotation. (1 day) Despite issues, prefer to work with Cecco for this product (but with Plywood). | POST AUTUMN | May 4 | Mar | RED |
| |
@Pearson Bulmer (Unlicensed) | MAX 2 | SOFA |
| Project on pause. DK mentioned on Monday Jan 23 what the status was on this project. Need an updated brief from DK on what he wants from this project. Complete reset, | Not assigned | - | - | RED |
| |
| INVESTMENT CHAIR | DINING CHAIR |
| A Swivel dining chair/office chair. Same product as talked about with Mina/Jordan. Team would like- more flexibility for alternate base options,
|
|
|
|
|
|
|
ALAN’s Task List
| Completed | To do |
| Priority Order | Start Date | End Date |
---|---|---|---|---|---|---|
Alinta | Adelaide TALL Headboard | Status TBA. Need to work on finer details for production |
| MED |
|
|
Tanya | Sculptural Sofa | Curved back rest, seat, new version with steel frame |
| HIGH | Ready next week |
|
Pearson | CNC machine | Magnolia Table |
| HIGH |
|
|
Jordan | Welders (John’s) | Bench (post electricians) |
| MED |
|
|
Sebastian | 1977 | John starting RHC. Allen to make the cover after Tanya’s backrest. |
| HIGH | This week after Organic backrest |
|