Design Team w/c 20/02/23 Meeting Minutes

Date

Week commencing : 20th February 2023

Attendees

@Alinta Lim @dominic.harrison @zara fong @Tanya Rechberger @Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) @Michele DiBlasio (Unlicensed)

Mtg Pending

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick @Sebastian

Project Updates:

GREEN : No more changes  

AMBER: Possibility for changes 

RED: Will more than likely change

BLUE : New Project

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT

STATUS

RELEASE STATUS

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT

STATUS

RELEASE STATUS

@Mina Bassilious (Unlicensed)

@Jordan Ruchalski (Unlicensed)

PALLINO PORTABLE

LIGHTING

ongoing

FLOCK on the water, arrive by Post Autumn

Purchase order split into 4 sections, next 3 orders can have colour changes based on market feedback.

Tarmac will start prototyping new colour options slowly.

Longer lead time stores will be late.

POST AUTUMN

Feb 10

ETA April 17th

ready for shipment
FLOCK production
Final production completed

GREEN

@Mina Bassilious (Unlicensed)

@Jordan Ruchalski (Unlicensed)

AURA PENDANT

LIGHTING

ongoing

Final samples not arrived in TU. Product development 100% complete.

Package design done. Supplier to sample the packaging now.

Supplier to send the sample to TU - ASAP. On the way.

Supplier has only our old Natural Oak colour and will send sample.

WINTER

Jun 15

Production week 26th March

Ideation
prototyping
design review
supplier handover
sampling

GREEN

@Mina Bassilious (Unlicensed)

LUNA TIMBER

BARSTOOL

 

1st batch of FLOCK on track for target date. 2 per store.

Bar stool height on the way, CAD Work for counter stool is completed and sampling in process in GL.

AUTUMN

Mar 23

ETA Mar 25

Done
Counter height in sampling

GREEN

@Mina Bassilious (Unlicensed)

ELEVATE

HOME-OFF

ongoing

Prototype in progress at GL. Components being sourced. Test criteria shared by Test Lab (MTS)

 

GL to continue with prototyping. More focus on the test criteria. R&D resources needed to get this project moving. Le Shu making prototype now.

Cecco top costing complete. Awaiting rest of product costing from GL.

SPRING

Sept 14

early July

Ideation
prototyping
design review
supplier handover
sampling

RED

@Mina Bassilious (Unlicensed)

SOLAIR ALU POCKET Accessory (with shade/turn dial shape)

ACCESSORY

ongoing

Samples received from supplier for review - review document underway.

Only black only is suitable for deep etch as silver is unlikely to be ready in time. Deep etch team can manage with this as long as they have a silver swatch to use for photoshop.

Package design done- in sampling with supplier.

Name to be given - SOLAIR

Not suitable to add at this late stage. Looking to see if the supplier has an option to change from ‘cool to warm’ light and can’t implement possibly integrate with Home Automation Systems (speak with Tony on DNC on Cloud)

Not assigned

-

-

Ideation
prototyping
design review
supplier handover
sampling

AMBER

@Mina Bassilious (Unlicensed)

HELIO PENDANT

LIGHTING

ongoing

Waiting on complete sample to sent to TU.

Deep Etch /lifestyle shoot has been scheduled. Tentatively booked for Late March. Product arriving this week.

CGI is potentially an option but Kirsty to confirm - not required at this stage.

WINTER

June 15

N/A

Ideation
prototyping
design review
supplier handover
sampling

AMBER

@Mina Bassilious (Unlicensed)

ETO DESK V2.0

HOME-OFF

ongoing

Components still at sourcing and not sampled. This project is moving TOO SLOWLY for Mina.

March 10 tooled part to be received.

We are thinking it is best to launch with all accessories. So push out to WINTER campaign.

paused

June 15

early April

RED

@Mina Bassilious (Unlicensed)

ETO TBL LAMP

HOME-OFF

ongoing

Waiting on complete sample - not urgent

paused- see above

June 15

early April

RED

@Mina Bassilious (Unlicensed)

ETO TASK LIGHT

HOME-OFF

ongoing

Waiting on complete sample

  • not urgent

paused- see above

June 15

early April

RED

@Mina Bassilious (Unlicensed)

ARC FLOOR (Adjust)

LIGHTING

ongoing

DK feedback was very positive and greatly appreciated. 2nd prototype starting this week for DK request to eclipse from the base. Tooling will be costly but will prototype anyway. DK approved but let’s have the conversation with DK again on form. Pricing of tapered component if worthwhile Michele will look into and get back to us 21st Feb.

Double illumination for up/down + dimming + app integration

WINTER

June 15

early April

RED

@Mina Bassilious (Unlicensed)

ARC TASK

LIGHTING

ongoing

Add-on for Zara’s Organic Sofa

A lot of above issues in this product too.

WINTER

June 15

early April

RED

@Mina Bassilious (Unlicensed)

LUNA MESH BARSTOOL & COUNTER STOOL

OUTDOOR

 

BAR STOOL: Sample reviewed by CW. Mina/Tony to discuss testing/seat heights.

The tooling done on the stool is incorrect, this needs to be addressed with GL & fabricator. A whole new seat form has been developed with updates- prototyping request with soft tool (limited use). Find out info on pricing and timing of soft tool- Mina.

COUNTER STOOL: Mina has complete engineering DWG. Seat pad needs to be re-considered- after sample off soft tool comes back successful.

 

POST WINTER

Aug 3

Early May

GREEN

@Mina Bassilious (Unlicensed)

ELEMENT EXTENSION TBL

OUTDOOR

Ongoing

New concept. DK to approve concept/range plan.

Note: design direction from DK is with a D end.

Extension mech spec sheet needed by the supplier.

Not assigned- paused. Need proper brief.

 

 

NEW

@Mina Bassilious (Unlicensed)

@Jordan Ruchalski (Unlicensed)

DESK CHAIR

HOME-OFF

ongoing

Initial prototype with timber back has been reviewed by DK - feedback was works well with ETO desk.

Not assigned- paused until time allocation completed.

 

 

NEW

@Mina Bassilious (Unlicensed)

LUNA UPH

BARSTOOL

& COUNTER STOOL

ongoing

BARSTOOL & COUNTER STOOL: Tooling not yet started yet. Tooling start 27th Feb. Have to shift to post winter- want to have photography sample by mid May- Air freight an extra preproduction flock sample for this.

COUNTER STOOL: Mina has complete engineering DWG for legs. Needs to be sampled to understand dynamic of stability.

 

POST WINTER

Aug 3

16th May

GREEN

@Mina Bassilious (Unlicensed)

LIGHTING GALLERY

VM

ongoing

Michele spoke to Jackie/Vickie/Emily on requirements

Michele feels that in store over product display is a better solution and feasible post Michael discussion. Michele will discuss with DK if he’s in agreement. Design of gallery on pause until DK conversation as may not be required.

Not Assigned

-

-

RED

@Mina Bassilious (Unlicensed)

DIRECTORS CHAIR

OUTDOOR

 

Brief from Alinta completed, CAD and tooling development to be shared with Mina. Mina need discussion with Tanya re design and also team priorities.

POST WINTER

Aug 3

Early May

RED

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

FIREFLY- outdoor lantern

OUTDOOR

 

Brief - portable, charging, ip rated, fabric integration for softer feel. Concept stage- conversation with Tanya once prototypes are completed. Jordan to look into mozzie repellant incorporation.

POST WINTER

Aug 3

Early May

RED

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

BAR CABINET

CASED GOODS

 

Commercialisation stage of this product to be considered with Michele first. It has been started, Priorities need to be defined.

Deprioritised

 

 

 

 

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

CASED GOODS

CASED GOODS

 

Commercialisation stage of this product to be considered with Michele first.

 

 

 

 

 

@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed)

HIGH-LOW floor light

LIGHTING

 

Commercialisation stage of this product to be considered with Michele first.

Prioritised

 

 

 

 

 

 


DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

 

STATUS

@Alinta Lim

@dominic.harrison

ADELAIDE

BEDROOM

 

CAPEX approval for tooling status to be confirmed by KFT - Frank says approved.

Proceeding- die casting underway, not worried. Aluminium extrusion off tool sample due this week.

Injection moulding (family tooling) underway, on track. Due 31st march

Veneering pricing MUCH TOO HIGH. Veneering samples fading too fast compared to GL samples, Alinta to find out GL finishes and TH finishes and find difference to improve TH.

Pricing is approved by DK and all already okay despite high initial pricing.

GL prototyping bed base, on track

Allan prototyping bedhead- finish 21/02/22

Bed instructions are critical.

Packaging still needs to be completed by Dom/Alinta and QC checks instigated.

WINTER

 

June 15

Early April.

Qty: 15 pieces

AMBER

@Alinta Lim

DUNE

CASE

 

Base/Leg design to be resolved. Work on new leg concepts over the next few weeks.

WINTER

 

June 15

Early April.

Qty: 15 pieces

RED

@Alinta Lim

@dominic.harrison

CABANA

OUTDOOR

 

Working with Dylan on these samples.

Still to design: - Corner caps, hooks, shade system, sun lounge frame- about to start prototyping.

Powder coat samples not yet received from Thailand.

Team Dolce will consider the photoshoot readiness and what costs would be involved and bring back next week. Costs provided need to push the go button.

  • existing ceramics- later release

  • consider ice bucket in platform table (needs to be stunningly achieved)- only for a later release

POST WINTER

 

Aug 3

Early May

Qty: TBA

AMBER

@Alinta Lim

GAZEBO

OUTDOOR

 

Scope stage, new project suggestion by DK

Tentaitive Spring release

-

-

NEW

@Alinta Lim

@dominic.harrison

GARDEN CHAIR

OUTDOOR

 

KFT to source the right tools for manufacture, otherwise this needs to be sourced by GL.

Waiting on images from KFT of prototype. Still waiting.

Consider target pricing- Team Dolce to try for BOM costing from TH, Michele has info, awaiting response.

Awaiting indicative costings from TH on stainless, will follow up this week.

POST WINTER

Aug 3

Early May

Qty: TBA

GREEN

@Alinta Lim

@dominic.harrison

PLATELETT TABLE

OUTDOOR

 

Adjustable height with manual turning mech. Material selection to be discussed with DK.

  • consider transferring to Sebastian. Tanya to talk to DK and Alinta.

POST WINTER

Aug 3

Early May

AMBER

@Alinta Lim

DIRECTOR CHAIR

OUTDOOR

 

Review with DK to understand his requirements on construction.

  • talk to Mina and Jordan and decide next steps from there

POST WINTER

Aug 3

Early May

AMBER

 

 

 

 

 

 

 

 

 

 

@Alinta Lim

@dominic.harrison

FLOATING 1977

OUTDOOR

 

No progress, progress on hold

SPRING

Sept 14

Early June

RED

@Alinta Lim

ISSHO MARBLE OCC. TBL

CASE

 

Gloss or honed finished to be sampled with supplier when GL is back.

Honed finish is DKs preference. Testing in GL now.

Consider thinner finish on carrara than marquina.

Legs in marble?

Not assigned

-

-

 

@Alinta Lim

ISSHO ASYMETRICAL DNG TBL

DINING

 

Redesign top shape, DK not happy with current form yet.

Awaiting plans from Michael.

Not assigned

-

-

NEW

@dominic.harrison

New organic 2.0 OCC. TBL

CASE

 

Working on preso for DK

WINTER

June 15

Early April

RED

@dominic.harrison

KATO OUTDOOR

OUTDOOR

 

Working on preso for DK

Post Winter/Spring

Aug 3

Early May

NEW

@Alinta Lim

POS FABRIC SAMPLE RACK

N/A

 

Timeline is ASAP, currently fabric samples stored in cupboards.

Alinta is on this and it seems a waste of her time consider design intern on this.

Not assigned

ASAP

ASAP

NEW

@Alinta Lim

@dominic.harrison

OLIVE TABLE

OUTDOOR

 

GL Product, 1800 table entered into SAP- Assets completed (not Cylindo, but check on the deep etch if completed or not.)

Find out from Michele which other rectangle sizes are required. (Console option.) Alinta will email Michele next week.

POST WINTER

Aug 3

Early May

Qty: TBA

GREEN

@Alinta Lim

OLIVE TABLE INDOOR

DINING

 

Range extension of the outdoor Olive. Premium indoor such as marble or stone look , powder coated legs, could try veneering but adds cost and wont sit as well within the King range.

Would be a quick win.

?

 

 

 

 


DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT STATUS

RELEASE STATUS

@Sebastian

1977

SOFAS

 

Photoshoot samples to be made in TU. FLOCK + Production from KFT

Revision to frame and specification of textile/colour offering in progress

Corner sample, DK didn’t get the understanding from planning (or changed his mind) and now this is adding time to the process. Sebastian will modify the existing corner prototype to fudge the new idea.

POST AUTUMN

 

May 4

Early April

 

AMBER

@Sebastian

MYCO

CASE

 

@Pearson Bulmer (Unlicensed) has shared renders, drawing, BOM. To be released with 1977

Sent to Thailand, timber colour being sourced.

Knock-in is being quoted (design complete), no feedback yet.

Awaiting feedback on powder coat colours.

POST AUTUMN

May 4

Early April

AMBER

 

 


DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT STATUS

RELEASE STATUS

@zara fong

ORGANIC

SOFA

 

Concept prototype in TU started. GL to prototype by early March (reduced seat depth version)

Task light briefed to @Mina Bassilious (Unlicensed)

Storage frame to be made in prep for storage mech resolve.

Arm/backrest done - Allan to prepare the cover so DK can review the ‘fabric ripple’

VM/Brand briefed. Fabric selection made for FLOCK.

Sebastian briefed on a organic shape floor rug

WINTER

June 15

Early April

RED

@zara fong

@Mina Bassilious (Unlicensed)

QUAY CHAIR

DINING

 

Scanning completed? this was to be the guide to CAD for foam molding and steel. Video or the process shared with the team?

Not assigned

-

-

RED

@Tanya Rechberger

CURVE

SOFA

 

DK confirmed the design direction. This week focus is CAD.

Early Feb John/Phil to prototype

WINTER

June 15

Early April

RED

@Tanya Rechberger

JASPER 20th

SOFA

 

FLOCK on the water. Deep Etch/CGI to be scheduled. AI, Product Cards to be done.

VM/Brand to confirm how many packages

AUTUMN

Mar 23

Jan

GREEN

@Tanya Rechberger

KATO BED

BEDROOM

 

Concept to get started

Not assigned

-

-

RED

@Tanya Rechberger

KATO V2.0

SOFA

 

Firmer seat option. GL prototype completed and DK approved, completing BOMS now.

Need to confirm which fabric/size for DK’s Maianbar house.

Not assigned

-

-

GREEN

@Tanya Rechberger

QUAY BAR STOOL

BAR STOOL

 

Sample received by GL.

Awaiting quality to determine testing standards.

Not assigned

-

-

RED

 


 

DESIGNER

PROJECT

CATEGORY

Actioned

To do

CAMPAIGN ASSIGNED

CAMPAIGN DATE

FLOCK TARGET DATE

DEVELOPMENT STATUS

RELEASE STATUS

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

HEIRLOOM CHR

DINING

 

Allan to complete the final pattern & AIR to KFT. Screen printed legs to have AW + SO finish by KFT supplier. Frank managing closely the colour match

Allan prepping patterns for SAP meterage in GL.

Awaiting DFM for plastic leg tooling from china, not started yet,

Consider trialing plastic leg sleeve tooling with fast turnaround new TH supplier.

Long lead time required for chairs in stores, have said 12 weeks plus.

Injection lugs for connection point of legs to chair and foot cap still in quotation process, pushing them, temp flock solutions are in play now.

Timber veneer issues in TH.

Foam structure has gluing inconsistencies. Need to be sorted and creates pattern issues.

Seats fine!

End of May ready for customer production out of TH.

Goalposts shifting at all times on this product.

Week of 27th Feb- working on design updates and user manuals for this product.

Needed more communication with designers from Ji about the product through the process, this was communicated with Ji after so hopefully will not happen after.

 

AUTUMN

Mar 23

Feb

Qty: 26

GREEN

@Pearson Bulmer (Unlicensed) @Mina Bassilious (Unlicensed)

HERITAGE FIX TBL

DINING

 

FLOCK underway. AW and AO timber sourced. Colour staining to be redone with GL QC present. Balance of FLOCK to be done by Cecco ETA June/July.

UZ sample due end of this week, reasonable option for flock and customer orders after proving sample.

Considering investigating new suppliers.

Investigate Indonesian suppliers with Michele.

Yoshi working on supplier agreements for quality control.

Where do we want to produce this table? Trying suppliers everywhere.

UZ table sample complete end of March, they are the only supplier so far to commit to making the full range including 3m table. The most promising in a sea of unpromising suppliers so far. If all goes to plan could be in production (rest of) flock mid May, with customer orders producing July.

Low fi user manuals for Heritage fixed table for showrooms from 27th Feb.

First Cecco table sample (1.8m due mid March) after that consider sampling other sizes, no commitment from them.

AUTUMN

Mar 23

Feb 15

QTY: 5

GREEN

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

HERITAGE EXT. TBL

DINING

 

Some extension mech’s have arrived, prototyping to start in TU. Cecco is the chosen supplier for FLOCK and production.- JUST NO,

Awaiting more mechanisms, as first mechs received were not up to our standards for suitability. Still need to source a mech that can be used for 2.4m to 3m- this is holding a much heavier weight. Making a new mech is a much longer tooling and development process.

(1.8s and 2.4s are way more popular in our sales history, but DK needs to confirm whether 2.4m to 3ish. We think DK will be happy with either option at the moment.)

Extension table needs more testing after design completion to make it customer ready (balance and compliance testing) due to nature of moving parts.

2nd extension table sample (using current mechanisms not best) plan to completed by Friday 10th March. This can be interacted with but not expecting to be anywhere final sample.

 

 

WINTER

June 15

April

RED

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

TASMAN CHR

DINING

 

Colour samples not accepted. Frank managing the colour match process with Parrawood (new supplier).

Tasman chair can be ready prior to Magnolia Table- is this wanted prior to Magnolia table release.

Move project to GL, nearly completed.

Tasman possibly can be ready for Winter, but very tight turnaround, (Magnolia table absolutely not ready).

Should we move this to China?

POST AUTUMN

May 4

Mar

GREEN

 

@Pearson Bulmer (Unlicensed) @Ryan McGoldrick

MAGNOLIA TBL

DINING

 

design stage TBA

Just need to stain black, meet with DK on Monday to present. (1 day)

Design drawings to be completed afterwards and sent to supplier for quotation. (1 day)

Despite issues, prefer to work with Cecco for this product (but with Plywood).

POST AUTUMN

May 4

Mar

RED

 

@Pearson Bulmer (Unlicensed)

MAX 2

SOFA

 

Project on pause. DK mentioned on Monday Jan 23 what the status was on this project.

Need an updated brief from DK on what he wants from this project. Complete reset,

Not assigned

-

-

RED

 

 

INVESTMENT CHAIR

DINING CHAIR

 

A Swivel dining chair/office chair. Same product as talked about with Mina/Jordan.

Team would like- more flexibility for alternate base options,

 

 

 

 

 

 

 

ALAN’s Task List

 

Completed

To do

 

Priority Order

Start Date

End Date

 

Completed

To do

 

Priority Order

Start Date

End Date

Alinta

Adelaide TALL Headboard

Status TBA. Need to work on finer details for production

 

MED

 

 

Tanya

Sculptural Sofa

Curved back rest, seat, new version with steel frame

 

HIGH

Ready next week

 

Pearson

CNC machine

Magnolia Table

 

HIGH

 

 

Jordan

Welders (John’s)

Bench (post electricians)

 

MED

 

 

Sebastian

1977

John starting RHC. Allen to make the cover after Tanya’s backrest.

 

HIGH

This week after Organic backrest