Design Team w/c 24/01/23 Meeting Minutes
Date | Week commencing : 24th of January 2023 |
Attendees | @Alinta Lim @dominic.harrison @zara fong @Tanya Rechberger @Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) @Michele DiBlasio (Unlicensed) |
Mtg Pending | @Pearson Bulmer (Unlicensed) @Ryan McGoldrick @Sebastian |
Project Updates:
GREEN : No more changes
AMBER: Possibility for changes
RED: Will more than likely change
BLUE : New Project
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | PALLINO PORTABLE | LIGHTING | ongoing | FLOCK ETA unknown due to regulations to AIR products with batteries. Goods still at GL. DHL to confirm the type of approval needed for AIR | POST SUMMER | Feb 10 | ETA Feb? | ready for shipment FLOCK production Final production completed | GREEN |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | AURA PENDANT | LIGHTING | ongoing | Final samples not arrived in TU. Product development 100% complete. Package design to be done. Supplier to sample the packaging now. Supplier to send the sample to TU - ASAP. To ask if the supplier has a Natural Oak colour. | AUTUMN | Mar 23 | N/A | Ideation prototyping design review supplier handover sampling | GREEN |
@Mina Bassilious (Unlicensed) | LUNA TIMBER | BARSTOOL |
| 1st batch of FLOCK on track for target date. 2 per store. | AUTUMN | Mar 23 | ETA Mar 25 | Done | GREEN |
@Mina Bassilious (Unlicensed) | ELEVATE | HOME-OFF | ongoing | Prototype in progress at GL. Components being sourced. Test criteria shared by Test Lab (MTS)
GL to continue with prototyping. More focus on the test criteria. R&D resources needed to get this project moving. | SPRING | Sept 14 | early July | Ideation prototyping design review supplier handover sampling | RED |
@Mina Bassilious (Unlicensed) | SOLAIR ALU POCKET Accessory (with shade/turn dial shape) | ACCESSORY | ongoing | Awaiting samples from supplier for review and deep etch after CNY. Package design done Name to be given - SOLAIR Looking to see if the supplier has an option to change from ‘cool to warm’ light and possibly integrate with Home Automation Systems (speak with Tony on DNC on Cloud) | Not assigned | - | - | Ideation prototyping design review supplier handover sampling | AMBER |
@Mina Bassilious (Unlicensed) | HELIO PENDANT | LIGHTING | ongoing | Waiting on complete sample to sent to TU. Deep Etch /lifestyle shoot to be scheduled. CGI is potentially an option but Kirsty to confirm. | AUTUMN | Mar 23 | N/A | Ideation prototyping design review supplier handover sampling | AMBER |
@Mina Bassilious (Unlicensed) | ETO DESK V2.0 | HOME-OFF | ongoing | Components still at sourcing and not sampled. This project is moving TOO SLOWLY for Mina. March 10 tooled part to be received. We are thinking it is best to launch with all accessories. So push out to WINTER campaign. | WINTER | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | ETO TBL LAMP | HOME-OFF | ongoing | Waiting on complete sample by March. This sample is needed for photoshoot. | WINTER | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | ETO TASK LIGHT | HOME-OFF | ongoing | Waiting on complete sample by March. This sample is needed for photoshoot | WINTER | June 15 | early April | RED | |
@Mina Bassilious (Unlicensed) | ARC FLOOR (Adjust) | LIGHTING | ongoing | DK feedback was very positive and greatly appreciated. 2nd prototype starting this week for DK request to eclipse from the base. Tooling will be costly but will prototype anyway. Double illumination for up/down + dimming + app integration | WINTER | June 15 | early April | NEW | |
@Mina Bassilious (Unlicensed) | ARC TASK | LIGHTING | ongoing | Add-on for Zara’s Organic Sofa | WINTER | June 15 | early April | NEW | |
@Mina Bassilious (Unlicensed) | LUNA MESH BARSTOOL & COUNTER STOOL | OUTDOOR |
| BAR STOOL: Sample reviewed by CW. Mina/Tony to discuss testing/seat heights. The tooling done on the stool is incorrect, this needs to be addressed with GL & fabricator. COUNTER STOOL: Mina to complete engineering DWG. Move to get this version sampled before asking CW to remodel. Seat pad needs to be re-considered.
| POST WINTER | Aug 3 | Early May | GREEN | |
@Mina Bassilious (Unlicensed) | ELEMENT CHAIR | OUTDOOR | Ongoing | TEAK Sample in progress with INDO supplier DWG for the timber seat & alu frame (with off the shelf extrusion) | POST WINTER | Aug 3 | Early May | RED | |
@Mina Bassilious (Unlicensed) | ELEMENT EXTENSION TBL | OUTDOOR | Ongoing | New concept. DK to approve concept/range plan. Note: design direction from DK is with a D end. Extension mech spec sheet needed by the supplier. | Not assigned |
|
| NEW | |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | DESK CHAIR | HOME-OFF | ongoing | Initial prototype ready for DK to review/approve this week. Foam to be done beforehand. | Not assigned |
|
| NEW | |
@Mina Bassilious (Unlicensed) | LUNA UPH | BARSTOOL & COUNTER STOOL | ongoing | BARSTOOL & COUNTER STOOL: Awaiting off-tool parts for sample to be made at GL. Winter campaign target date is realistic. COUNTER STOOL: Mina to share the engineering DWG to be done end of this week. Needs to be sampled to understand dynamic of stability.
| WINTER | June 15 | early April | GREEN | |
@Mina Bassilious (Unlicensed) | LIGHTING GALLERY | VM | ongoing | Awaiting feedback from Jackie/Vickie/Emily on requirements Em & Kirsty meeting on 31st - feedback pending | Not Assigned | - | - | RED | |
@Mina Bassilious (Unlicensed) | DIRECTORS CHAIR | OUTDOOR |
| Handover from Alinta, CAD and tooling development to be shared with Mina. | POST WINTER | Aug 3 | Early May | RED | |
| |||||||||
| |||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE |
| STATUS |
@Alinta Lim @dominic.harrison | ADELAIDE | BEDROOM |
| CAPEX approval for tooling status to be confirmed by KFT - Frank says approved. Proceeding- die casting underway, not worried. Some unusual proceedings with tooling, will have to wait and see. Injection moulding (family tooling) underway, on track. Veneering pricing underway. Veneering samples fading too fast compared to GL samples, Alinta to find out GL finishes and TH finishes and find difference to improve TH. Pricing is approved by DK and all already okay despite high initial pricing. GL prototyping bed base, on track Allan prototyping bedhead- on track if he gets the time. Bed instructions are critical. Packaging still needs to be completed by Dom/Alinta and QC checks instigated. | WINTER
| June 15 | Early April. Qty: 15 pieces | AMBER | |
@Alinta Lim | DUNE | CASE |
| Base/Leg design to be resolved. Work on new leg concepts over the next few weeks. | WINTER
| June 15 | Early April. Qty: 15 pieces | RED | |
@Alinta Lim @dominic.harrison | CABANA | OUTDOOR |
| Working with Dylan on these samples. Still to design: - Corner caps, hooks, shade system, sun lounge frame. Powder coat samples not yet received from Thailand. Team Dolce will consider the photoshoot readiness and what costs would be involved and bring back next week.
| POST WINTER
| Aug 3 | Early May Qty: TBA | AMBER | |
@Alinta Lim | GAZEBO | OUTDOOR |
| Scope stage, new project suggestion by DK | Not assigned | - | - | NEW | |
@Alinta Lim @dominic.harrison | GARDEN CHAIR + OLIVE TABLE | OUTDOOR |
| KFT to source the right tools for manufacture, otherwise this needs to be sourced by GL. Waiting on images from KFT of prototype. Consider target pricing- Team Dolce to try for BOM costing from TH | POST WINTER | Aug 3 | Early May Qty: TBA | GREEN | |
@Alinta Lim @dominic.harrison | PLATELETT TABLE | OUTDOOR |
| Adjustable height with manual turning mech. Material selection to be discussed with DK.
| POST WINTER | Aug 3 | Early May | AMBER | |
@Alinta Lim | DIRECTOR CHAIR | OUTDOOR |
| Review with DK to understand his requirements on construction.
| POST WINTER | Aug 3 | Early May | AMBER | |
@Alinta Lim | KATO | OUTDOOR |
|
| POST WINTER | Aug 3 | Early May | NEW | |
@Alinta Lim @dominic.harrison | FLOATING 1977 | OUTDOOR |
| No progress, progress on hold | SPRING | Sept 14 | Early June | RED | |
@Alinta Lim | ISSHO MARBLE OCC. TBL | CASE |
| Gloss or honed finished to be sampled with supplier when GL is back. Honed finish is DKs preference. Consider thinner finish on carrara than marquina. Legs in marble? | Not assigned | - | - |
| |
@Alinta Lim | ISSHO ASYMETRICAL DNG TBL | DINING |
| Redesign top shape, DK not happy with current form yet. Awaiting plans from Michael. | Not assigned | - | - | NEW | |
@dominic.harrison | New organic 2.0 OCC. TBL | CASE |
| New base option to suit Organic Sofa by Zara | WINTER | June 15 | Early April | RED | |
@Alinta Lim | POS FABRIC SAMPLE RACK | N/A |
| Timeline is ASAP, currently fabric samples stored in cupboards. Alinta is on this and it seems a waste of her time consider design intern on this. | Not assigned | ASAP | ASAP | NEW |
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@Sebastian | 1977 | SOFAS |
| Photoshoot samples to be made in TU. FLOCK + Production from KFT Revision to frame and specification of textile/colour offering in progress | POST AUTUMN
| May 4 | Early April
| AMBER | |
@Sebastian | MYCO | CASE |
| @Pearson Bulmer (Unlicensed) to share renders, drawing, BOM. To be released with 1977 | POST AUTUMN | May 4 | Early April | AMBER |
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@zara fong | ORGANIC | SOFA |
| Concept prototype in TU started. GL to prototype by early March (reduced seat depth version) Task light briefed to @Mina Bassilious (Unlicensed) Storage frame to be made in prep for storage mech resolve. Arm/backrest done - Allan to prepare the cover so DK can review the ‘fabric ripple’ VM/Brand briefed. Fabric selection made for FLOCK. Sebastian briefed on a organic shape floor rug | WINTER | June 15 | Early April | RED | |
@zara fong @Mina Bassilious (Unlicensed) | QUAY CHAIR | DINING |
| Scanning completed? this was to be the guide to CAD for foam molding and steel. Video or the process shared with the team? | Not assigned | - | - | RED | |
@Tanya Rechberger | CURVE | SOFA |
| DK confirmed the design direction. This week focus is CAD. Early Feb John/Phil to prototype | WINTER | June 15 | Early April | RED | |
@Tanya Rechberger | JASPER 20th | SOFA |
| FLOCK on the water. Deep Etch/CGI to be scheduled. AI, Product Cards to be done. VM/Brand to confirm how many packages | AUTUMN | Mar 23 | Jan | GREEN | |
@Tanya Rechberger | KATO BED | BEDROOM |
| Concept to get started | Not assigned | - | - | RED | |
@Tanya Rechberger | KATO V2.0 | SOFA |
| Firmer seat option. Drawing done, Phil to get started, Allan to help with sewing. | Not assigned | - | - | RED | |
@Tanya Rechberger | QUAY | BAR STOOL |
| Sample received by GL. Next steps? | Not assigned | - | - | RED |
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HEIRLOOM CHR | DINING |
| Allan to complete the final pattern & AIR to KFT. Screen printed legs to have AW + SO finish by KFT supplier. Frank managing closely the colour match | AUTUMN | Mar 23 | Feb Qty: 26 | GREEN | |
@Pearson Bulmer (Unlicensed) @Mina Bassilious (Unlicensed) | HERITAGE FIX TBL | DINING |
| FLOCK underway. AW and AO timber sourced. Colour staining to be redone with GL QC present. Balance of FLOCK to be done by Secco ETA June/July | AUTUMN | Mar 23 | Feb 15 QTY: 5 | GREEN | |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HERITAGE EXT. TBL | DINING |
| Some extension mech’s have arrived, prototyping to start in TU. Secco is the chosen supplier for FLOCK and production. | WINTER | June 15 | April | RED | |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | TASMIN CHR | DINING |
| Colour samples not accepted. Frank managing the colour match process with Parrawood (new supplier) | POST AUTUMN | May 4 | Mar | GREEN | |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | MAGNOLIA TBL | DINING |
| design stage TBA | POST AUTUMN | May 4 | Mar | RED | |
@Pearson Bulmer (Unlicensed) | MAX 2 | SOFA |
| Project on pause. DK mentioned on Monday Jan 23 what the status was on this project. | Not assigned | - | - | RED |
ALAN’s Task List
| Completed | To do |
| Priority Order | Start Date | End Date |
---|---|---|---|---|---|---|
Alinta | Adelaide TALL Headboard | Status TBA. Need to work on finer details for production |
| MED |
|
|
Tanya | Sculptural Sofa | Curved back rest, seat, new version with steel frame |
| HIGH | Ready next week |
|
Pearson | CNC machine | Magnolia Table |
| HIGH |
|
|
Jordan | Welders (John’s) | Bench (post electricians) |
| MED |
|
|
Sebastian | 1977 | John starting RHC. Allen to make the cover after Tanya’s backrest. |
| HIGH | This week after Organic backrest |
|