Design Team w/c 29/05/23 Meeting Minutes
Date | Week commencing : 29th May 2023 |
Attendees | @Alinta Lim @dominic.harrison @zara fong @Tanya Rechberger @Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) @Michele DiBlasio (Unlicensed) |
Mtg Pending | @Pearson Bulmer (Unlicensed) @Ryan McGoldrick @Sebastian |
Project Updates:
GREEN : No more changes
AMBER: Possibility for changes
RED: Will more than likely change
BLUE : New Project
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
|
|
|
|
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | PALLINO PORTABLE | LIGHTING | ongoing | Tarmac will start prototyping new anodised colour options slowly. Colours driven by Michele. Stock will be late, should be confirmed how long the lead time before sale period starts. Tarmac will let Michele know all stock lead times prior to sale start in order for showroom communication. Spare parts- Mina will look into it and compare to other products ask Yoshi. Then enter spare part items into SAP. Push Yoshi on this. No stock in GL, should be 35 days (original 45 day lead time) from manufacturing completion. Mina is trying to get confirmation on lead time for this production so that we can update Kitty on production lead time before start of new sale- Not launching product until stock arrives, planned for June/early July at this stage. This will impact the lead time. Show at Managers meeting | FLOCK on the water, arrive by Post Autumn Purchase order split into 4 sections, next 3 orders can have colour changes based on market feedback.
| POST AUTUMN | May 1st | Completed | ready for shipment FLOCK production Final production completed | GREEN |
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | AURA PENDANT | LIGHTING | ongoing | Final samples arrived in TU. Product development 100% complete. Package design completed. Follow up with Coffey. Testing the operation mech, 5000 cycles usability. Put this information in product info sheets. Whole product warranty Mina check that it fits in with current warranty pendant system in King range. Mina will contact Coffey about whether they can commit to 2 years warranty for Aura as they do for Lume light. No guidelines from Coffey about specific use requirements for Aura. Mina will hand over warranty docs to Michele and James. Aura plug in light create a new master item in system to make the future process simpler. Mina will communicate with Hussain on wiki updates once name confirmed and the process we will follow with timings. 100 pcs initial stock pieces and Michele to work together with Yoshi for purchase order. Flock still being worked out, but estimate for production quantities (possibly 2nd PO). After that hand over completely to Michele. Faro name - still in conversation with legal team. | WINTER- air freight for flock would be required- and stock for immediate release? | Jun 15 | Production week 26th March | Ideation prototyping design review supplier handover sampling Customer/showroom documentation | GREEN |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | LUNA TIMBER | BARSTOOL |
| Done, counter stool also available now. Will remove from task list. Will get quote on air freighting counter height bases for managers meeting to show the lower height and upholstered item. | AUTUMN | Mar 23 | ETA Mar 25 | Done Customer/showroom documentation Counter height in sampling Ready for production | GREEN |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | ELEVATE | HOME-OFF | ongoing | Sample completed in GL (missing under desk storage components). Cecco top sample received. Awaiting rest of product costing from GL. Consider sending Elevate top to new solid timber suppliers. Xiangu sample also completed, awaiting costings from Xiangyu and JiaShun. @Tanya Rechberger Tanya to discuss with Shiyang re project management resource for desks. Aesthetic design in solidworks for the leg sleeve is done, Mina will render the timber/black versions for us to assess. Once ordering process is refined, will put elevate samples on a boat to assess here in TU. | SUMMER- delayed by DK | Sept 14 | early July | Ideation prototyping design review supplier handover sampling | RED |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | SOLAIR ALU POCKET Accessory (with shade/turn dial shape) | ACCESSORY | ongoing | Samples received from supplier for review - review sent and feedback received, they will implement updates, new sample underway. Still no lead time info. Only black is suitable for deep etch as silver is unlikely to be ready in time. Deep etch team can manage with this as long as they have a silver swatch to use for photoshop. Still not shot. Package design done- in sampling with supplier- @Mina Bassilious (Unlicensed) Approved packaging. Not suitable to add light colour update at this late stage. Looking to see if the supplier has an option to change from ‘cool to warm’ light and can’t implement possibly integrate with Home Automation Systems - this will cost $300K, Dylan need to discuss with SLT. Coffey also possibly has an option but with King App is preference. DK has requested that we don’t do the expensive option, possibly a King Lighting App only which is managed by someone else. Mina and Jordan should start discussions with Infinite luxe and research other companies for price/feature comparisons to ensure we know what we’re talking about with Coffey. @Mina Bassilious (Unlicensed) will speak to Dylan about white label apps that we can possibly rebrand as well. Then we can go back to DK with 3 options, no brand, rebrand and Ingenuity. In terms of production readiness for flock is very much PO dependent. Mina will push Yoshi to send purchase order once design is finalised. Costings arrived, send to Michele, but still awaiting tooling so won’t chase pricing team just yet. | WINTER- even with airfreight will be late due to production lead time. Product sample not completed yet. Push to Post Winter or beyond. Mina to confirm. | - | - | Ideation prototyping design review supplier handover sampling | RED |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | HELIO PENDANT | LIGHTING | ongoing | DK meeting happened, a lot of feedback from DK which has changed the course and brief. Weight is important (consider plastic or reduce alu material). Mechanical vertical movement mech remote operation direction now (single ceiling point), Jordan will start the conversation with Coffey. App integration is dumbed down for cost purposes- see above (Solaire). @jordan will did some work on the modular version to explain to DK the number of wires visible and complexity of electrician set up. Will render one version and send to DK. Idea is individual pendants that magnetise together but are powered separately (electrician joins in ceiling to use one switch on the wall). Need an end cap- put aside until gap in firefly timeline. | DELAYED |
| N/A | Ideation prototyping design review supplier handover sampling | RED |
|
|
|
|
|
@Mina Bassilious (Unlicensed) | ETO DESK V2.0 | HOME-OFF | ongoing | Timber accessories all samples complete. Handful of adjustments with the team, Mina managing in a document. TF discussion happened- he’s open to updates, with no1 request being solid timber top. Preferencing new top style. All is resting on pricing for the time being, if solid top can be accommodated then production almost ready. If veneer then will need resampling. Need pricing feedback first. Aluminium charger ring, Mina is CNCing down to try and show production team that iit should be possible to achieve Toms dream. New laptop stand design approved by Tom, engineering drawings approved by sampling. Awaiting meeting booking by Michele. | paused | June 15 | early April | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | ETO TBL LAMP | HOME-OFF | ongoing | Sample arrived, 95% sample, assessment by Tom required and Tanya talk to DK. Oak colour is wrong. Update with Tom completed, Coffey will resample and answer questions | paused- see above | June 15 | early April | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | ETO TASK LIGHT | HOME-OFF | ongoing | Sample arrived, 95% sample, assessment by Tom required and Tanya talk to DK.- battery missing. Need to make it a non-tipping product after Tom assesses it. Oak colour is wrong. Update with Tom completed, Coffey will resample and answer questions. | paused- see above | June 15 | early April | RED |
|
|
|
|
| |
want to move designer | ARC FLOOR (Adjust) | LIGHTING | ongoing | DK feedback was very positive and greatly appreciated. 2nd prototype starting this week for DK request to eclipse from the base. Tooling will be costly but will prototype anyway. DK approved but let’s have the conversation with DK again on form. Pricing of tapered component if worthwhile Michele will look into and get back to us 21st Feb. Double illumination for up/down + dimming + app integration | UNASSIGNED |
|
| RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | LUNA MESH BARSTOOL & COUNTER STOOL | OUTDOOR |
| BAR STOOL: Sample reviewed by CW. The tooling done on the stool is incorrect, this needs to be addressed with GL & fabricator. A whole new seat form has been developed with updates- prototyping request with soft tool (limited use). Find out info on pricing and timing of soft tool- Mina. Making progress with no lead time yet. Mina follow up Shiyang and explain the lead time for sale. COUNTER STOOL: Shorter frame approved and will be incorporated into Timber stool, same base concept used for mesh stool. | POST WINTER!- Spring? | Aug 3 | 16th May | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | LUNA UPH | BARSTOOL & COUNTER STOOL | ongoing | BARSTOOL & COUNTER STOOL: Dome consideration to add to seat top. Cut dome in production for flock. UK flock foam is untested by Tarmac, Shiyang has looked at it and sent flock but no feedback as yet. SAP entered, pricing recieved. GL is making flock and ready for production. @Mina Bassilious (Unlicensed) will approve flock via images after production. Will get quote on air freighting counter height bases for managers meeting to show the lower height and upholstered item. | POST WINTER | Aug 3 | 16th May | GREEN |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | ELEMENT EXTENSION TBL | OUTDOOR | Ongoing | New concept. DK to approve concept/range plan. Waiting on Tanya looking over the brief. (Need to discuss with DK.) Note: design direction from DK is with a D end. Extension mech spec sheet needed by the supplier. Mina do concepts by next week to review. Set meeting to go through it Wednesday 26th April. | Not assigned- paused. Need proper brief. |
|
| NEW |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | DESK CHAIR | HOME-OFF | ongoing | Initial prototype with timber back has been reviewed by DK - feedback was works well with ETO desk. | Not assigned- paused until time allocation completed. |
|
| NEW |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | LIGHTING GALLERY | VM | stopped | Michele spoke to Jackie/Vickie/Emily on requirements Michele feels that in store over product display is a better solution and feasible post Michael discussion. Michele will discuss with DK if he’s in agreement. Design of gallery on pause until DK conversation as may not be required. Not a project as company agreed to install into ceiling. | Not Assigned | - | - | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) | DIRECTORS CHAIR | OUTDOOR |
| Prototype had issues and it wasn’t great. Mina will make new steel prototype to verify the comfort and folding mechanism. Verifying strength in aluminium will be very tricky. Asking Engineers, hopefully there’s some help available there, but will be theoretical. After prototype of steel, awaiting Allan for sling cover. Cover test with press studs on steel sample. Plan to go to prototype tooling ASAP (after 1 month extrusion tooling ready). This then needs to tested in press tools, with aluminium bounce back would expect issues, but minimal 2 weeks for tweaking. This is with press tool starting at same time as extrusion tooling. Welding testing with off tool samples for aesthetics, strength and manufacturability after extrusion tool completed. Even minimising the sling cover prototyping time (1 week) we are in early september for production start. Even if we start tooling after quoting immediately, we are still mid July for off tool components. Need to work out using off tool components all the small mechs at this point as well. Even if we buy off the shelf extrusion, we need to make 4 weeks for press tool + 2 weeks for tweaking. Mina not interested in weeks of workshop time to make the photoshoot items which will not be useful for product release and will slow that down. Coupling feature for the tension rods, Mina has designed a good concept, will speak to Alinta/Shiyang on moulding capabilities of it. @Mina Bassilious (Unlicensed) designing the middle pivot point feature- has designed 2 options, one is push fit risky as might not be rattle free and tight enough hold. The Screw fit concept is complex assembly and manufacturing process but tight once in position. We prefer press fit knock-in method. Order the extrusion tooling after discussing with Engineers. Mina will start quotation process for extrusion tooling today to try to speed up the tooling start time if we make no changes. | Unassigned as yet | Aug 3 | Early May | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | FIREFLY- outdoor lantern | OUTDOOR |
| Brief - portable, charging, ip rated, fabric integration for softer feel. Concept stage- conversation with Tanya once prototypes are completed. Jordan to look into mozzie repellant incorporation. Brief update permanent outdoor version, so needs higher IP rating. DK confirmed wants outdoor charging station. @Jordan Ruchalski (Unlicensed) -speak to Coffey about creating an outdoor rated charging unit @Jordan Ruchalski (Unlicensed) Finish 3D print 30/05 and big goal to have a form idea which DK accepts by 2/06. Testing other quick texture ideas in solidworks. Test acrylic idea for DK 30/05, while having moulding options available. DK meeting 31/05- charging near house rather than in garden space. Removable battery? Start with smooth finish consider adding ribs/texture down the line. Make the shapes more mix and match between the sizes (squat and elongated). Upmarket sound solution to incorporate in (ask Coffey). Plus bluetooth connectivity (turning on and off), as well as possibly incorporating solar.
| Post spring | Aug 3 | Early May | RED |
|
|
|
|
| |
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | BAR CABINET | CASED GOODS |
| Commercialisation stage of this product to be considered with Michele first. It has been started, Priorities need to be defined. | Deprioritised |
|
|
|
|
|
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | CASED GOODS | CASED GOODS |
| Commercialisation stage of this product to be considered with Michele first. | Deprioritised |
|
|
|
|
|
|
|
|
|
@Mina Bassilious (Unlicensed) @Jordan Ruchalski (Unlicensed) | HIGH-LOW floor light | LIGHTING |
| Commercialisation stage of this product to be considered with Michele first. | DePrioritised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
|
|
|
|
| |||||||||
|
|
|
|
| ||||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE |
| STATUS |
|
|
|
|
|
@Alinta Lim @dominic.harrison | ADELAIDE | BEDROOM |
| Injection moulding completed. Veneering pricing underway. Veneering samples fading too fast compared to GL samples, Dylan finding out if issues. Alinta will follow up Dylan again for standards. Bed instructions are critical. Dom will do a back up video but possibly CS can handle the video. Packaging sent over. On hold for time being until design finalised again. Working on extending sizing rollout after flock. California King- not for US flock, but will be offered- GL for mattress, and other beds. SAP preparation underway. On hold for time being until design finalised again. Feasibility of corner completed, whole frame feasibility expected Tuesday 16/05. Top of bed technique, needs to be decided based of Cabana best solution. 8 weeks for spring production readiness. Inner frames- 35x20 tube was strong enough. Pins to connect the two frames together- need to test, Alinta to manage. Mosquito net second attempt in TH still not right, not quite sure what issues were.
|
|
| WINTER
| June 15 | Early April. Qty: 15 pieces | AMBER |
|
|
| |
@Alinta Lim | DUNE | CASE |
| DK approved current leg design and low style (not in line with mattress height), Alinta will expand the range as necessary and work with JiaShun on further updates. (Draw mech etc) Attachment method redesign. Ask James about testing criteria. | WINTER
| June 15 | Early April. Qty: 15 pieces | RED |
|
|
|
|
| |
@Alinta Lim @dominic.harrison | CABANA | OUTDOOR |
| Roof structure- redesigned- DK happy. Sun lounge frame for GL - this week do CAD or otherwise to send to Shiyang. Almost there, complete 30/05. Cabana seat cushion reticulated seat with mesh cover (no glue) completed. DK liked it. Mesh cover seems a success so far. Hot glue to provide extra strength to hold. - costing before end of the week. Possibly high costs in the mesh, hot glue only is the back up plan but harder for the factory. Powder coat samples arrived into TH. Gloss level wrong, ask Nan to take middle sample from GL (varying GL versions) get supplier to match. DK happy with a higher gloss level sample but Alinta will continue to push the TH team to get a GL match as well. @Alinta Lim will check with James P. about whether the TH outdoor foam is suitable. Knock-ins will be tooled in China- Shiyang is okay on that. Travel- Thailand. Maybe next week Alinta will know. Frame design is happening with DK in TH. Extra design considerations, not looking at yet:
|
|
| POST WINTER
| Aug 3 | Early May Qty: TBA | RED |
|
|
| |
@Alinta Lim | GAZEBO | OUTDOOR |
| Scope stage, new project suggestion by DK | Not assigned | - | - | NEW |
|
|
|
|
| |
@Alinta Lim @dominic.harrison | GARDEN CHAIR + OLIVE TABLE | OUTDOOR |
| Sample on way to TU | POST WINTER | Aug 3 | Early May Qty: TBA | RED |
|
|
|
|
| |
@Alinta Lim @dominic.harrison | PLATELETT TABLE | OUTDOOR |
| Adjustable height with manual turning mech. Material selection to be discussed with DK.
| POST WINTER | Aug 3 | Early May | RED |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
@dominic.harrison | KATO/New name | OUTDOOR |
|
| SPRING | Aug 3 | Early May | AMBER |
|
|
|
|
| |
@Alinta Lim | ISSHO MARBLE OCC. TBL | CASE |
| Gloss or honed finished to be sampled with supplier when GL is back. Honed finish is DKs preference. Consider thinner finish on carrara than marquina. Legs in marble? | Not assigned | - | - |
|
|
|
|
|
| |
@Alinta Lim | ISSHO ASYMETRICAL DNG TBL | DINING |
| Redesign top shape, DK not happy with current form yet. DK suggested prototype using the builder from his house, Alinta has asked Michael, awaiting a response from builder. | Not assigned | - | - | NEW |
|
|
|
|
| |
@dominic.harrison | New organic 2.0 OCC. TBL | CASE |
| New base option to suit Organic Sofa by Zara Need to follow up Dom on updating. Make marble version. | WINTER | June 15 | Early April | RED |
|
|
|
|
| |
@Alinta Lim | POS FABRIC SAMPLE RACK | N/A |
| Timeline is ASAP, currently fabric samples stored in cupboards. Alinta is on this and it seems a waste of her time consider design intern on this. | Not assigned | ASAP | ASAP | NEW |
|
|
|
|
| |
@Alinta Lim | SONOS ERA 100 BRACKET |
|
| A lot of emails regarding the naming. Nearly done |
|
|
|
|
|
|
|
|
|
|
@Alinta Lim | SPEAKER BRACKET UNIVERSAL |
|
| Universal bracket after Adelaide Bed | Not assigned | Not assigned |
|
| NEW |
|
|
|
|
|
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
---|---|---|---|---|---|---|---|---|---|
@Sebastian | 1977 | SOFAS |
| Flock products finished, with Michele for now for logisitics. Magic joiners are not functioning without frame alterations, we think investigating velcro joiners is the best, if in stock test the concept 31/05. Have a meeting with DK Monday/Tues. Working on product range expansion. White frame of chaise with arm due 3rd May. Urgently working on Accordian style love seat first.
Design registration disclosure -sent with all products except the ottoman Cylindo: Hussain has everything from Seb and is on his plate. Deep etched images- Seb to look through images and let Anna B. know if there are any improvements that need to be made. Future point- Liaise with James Pudney on load testing/quality. | WINTER | June 15 | Early April
| AMBER | |
@Sebastian | MYCO | CASE |
| Production finished, flock underway. Spare parts collating and organising together with Hussain. Will show at managers meeting. Liaise with James Pudney on load testing/quality. | POST WINTER | 5th August | Mid May | AMBER | |
@Sebastian | OUTDOOR C TABLE | OUTDOOR |
| Vague brief given to Sebastian by DK. Brief which will start with investigations, can Seb start with it in between other projects, Seb will set that meeting. On peripheral. | Unassigned |
|
|
|
|
@Sebastian | 1977 OUTDOOR SOFA | OUTDOOR |
| Drain through fabric outdoor version of sofa.
|
|
|
|
| AMBER |
@Sebastian | POOL FURNITURE | OUTDOOR |
|
|
|
|
|
|
|
@Sebastian | ARC FLOOR LIGHT | LIGHTING |
|
|
|
|
|
|
|
|
| ||||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
|
|
---|---|---|---|---|---|---|---|---|---|---|---|
@zara fong | AURA | SOFA |
|
| WINTER | June 15 | Early April | GREEN |
|
| |
@zara fong | Aura Outdoor | OUTDOOR |
|
|
|
|
|
|
|
|
|
@zara fong | AURA FLOAT | FLOAT | PAUSE |
|
|
|
|
|
|
|
|
@zara fong | ARC TASK | LIGHTING | ongoing |
| Unassigned | June 15 | early April | RED |
|
| |
@zara fong
| QUAY CHAIR | DINING |
| Scanning completed? this was to be the guide to CAD for foam molding and steel. Video or the process shared with the team? Discuss with DK regarding the Quay Chair foam moulding already completed. | Not assigned | - | - | RED |
|
| |
@zara fong | QUAY BAR | BAR STOOL |
| Sample received by GL. Next steps?
| Not assigned | - | - | RED |
|
| |
@Tanya Rechberger @zara fong | CURVE | SOFA |
| DK confirmed the design direction. Will transfer to Zara when she has time after Aura and Aura outdoor. Update brief, post Milan- run past DK. | SUMMER? | 26/12 | 24th September | AMBER |
|
| |
@Tanya Rechberger | JASPER 20th | SOFA |
| FLOCK on the water. Deep Etch/CGI to be scheduled. AI, Product Cards to be done. VM/Brand to confirm how many packages. Enter new SAP code for Curve with light, and new smart pocket. Changeover this week- go and check the lights. | AUTUMN | Mar 23 | Jan | GREEN |
|
| |
@Tanya Rechberger | KATO BED | BEDROOM |
| Concept to get started. Don’t have a brief yet. | Not assigned | - | - | RED |
|
| |
@Tanya Rechberger | KATO V2.0 | SOFA |
| Firmer seat design completed. Enter into SAP? | Not assigned | - | - | RED |
|
| |
@Tanya Rechberger | AMARA CHAIR SOFT | DINING |
| DK completed in GL, need to follow through production
|
|
|
|
|
|
|
|
@Tanya Rechberger | LUNA OCCASIONAL INDOOR CHAIR UPDATE | OCCASIONAL |
| Charles wants to update the comfort of the inside of the occasional chair, DK has approved the process start. Trying to get Charles to manage the prototyping process. Have found chair for using on sampling. @Tanya Rechberger to bring up to design area. Shiyang searching for latest Luna indoor chair file to pass on to CW. |
|
|
|
|
|
|
|
@Tanya Rechberger | Super soft foam exploration | SOFA GENERAL |
| DK wants to explore using a super soft foam which is high density to replace dacron in some circumstances. Seen it at Cassina. The team found a foam to replace LT48, rejected because they didn’t understand the purpose of the foam, as a backup supplier. It wasn’t as good as LT48 so they rejected it. Perhaps they misunderstood the brief. Tanya to ask DK for more details. @Tanya Rechberger discuss with Michele and DK re the designer and priority of DKs new sofa design. Also ask MD for foam sample from Italy if possible. |
|
|
|
|
|
|
|
| ||||||||||
DESIGNER | PROJECT | CATEGORY | Actioned | To do | CAMPAIGN ASSIGNED | CAMPAIGN DATE | FLOCK TARGET DATE | DEVELOPMENT STATUS | RELEASE STATUS |
|
---|---|---|---|---|---|---|---|---|---|---|
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HEIRLOOM CHR | DINING |
| Plastic injection moulding for legs underway- due in GL 7th May, 2 weeks for veneering. Due in Thailand 29th May. Have not shipped out yet, won’t ship out from GL until mid June. Shouldn’t negatively impact customer timelines. Plastic legs fit well, after welding jigs were corrected. First production week in TH at the latest 2325- June 12th. Tight turnaround on production but after off tool leg test was successful, don’t anticipate issues. Ponti to communicate to Shiyang that can’t afford any more leg delays or GL will be the cause of further delay. Email sent to Frank/Joseph asking about upcoming orders and lead times required. They are aware but limited feedback from them. Pattern making updates from DK in TH hopefully finished next week. Small tweaks underway. Requested packaging testing, awaiting feedback. Requested die lines for die lines in order to start packaging artwork, awaiting Shiyang. Requested images from DK of design update for managers meeting. | AUTUMN | Mar 23 | Feb Qty: 26 | RED |
| |
@Pearson Bulmer (Unlicensed) @Mina Bassilious (Unlicensed) | HERITAGE FIX TBL | DINING |
| Second and final Sample from UZ home underway, we pivoted them away from this priority over to extension table. Could possibly review the required updates on an ext. table. TBC closer to date.
| POST SPRING | 4th November | 13th August | AMBER |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | HERITAGE EXT. TBL | DINING |
| GL Making sample now. Working on multiple avenues at the moment, custom supplier parts and in house version. DK pushed for in house again, Shiyang has big concerns which have been communicated with DK. Working to tight timeline as updated by Team Ponti here 2023 PROJECT CALANDER Ryan&Pearson.xlsx Mechanisms have been ordered. DK signed off on 90 degree timber veneer and on table mechanisms. Ponti followed up with Ivy whether the factory will have all required parts and components on hand the moment that the prototype is signed off. Will also ask Ivy if there is any way to speed up the prototype and production, they agreed to try as much as possible. Had some supplier hiccups on timeline issues currently looking at 3-4 weeks late for UK, CA- 2-3 weeks late, VicQld 1-2 weeks late. Will assess again closer to the and do our best to claw time back. Prototype time 6.5 weeks which has begun, quotation approved, approx $1000 higher than the fixed table. Payment for sample has been processed. UZ prototype expected due date is July 10-16th. June 24th is new sample date from speedy new Shanghai supplier, but we don’t have as much faith in this version. It’s a back up plan. They have signed NDA and agreement already. Leo/Frank and Sheng not required yet to go down to help brief UZ. Meeting with full group including Quality, to get everyone up to speed and hand over all tasks, action items will be emailed out by Ryan today. Feedback to come of exactly which test standards for this part. First products will likely be shipped without testing for speed, but testing on matching parts once on water. Ponti meeting with Tony D. as well to manage number of drivers for lift etc. Will ask Tony to pass onto his team members (Michele opt. invite). Already discussed with Michele regarding weights, minimum 4 person, possibly 6 person lift. UZ to provide weight possibly. Starting on motor addition, purchasing at GL have ordered custom linear actuator for slide mech., rotational motor still in discussions. Latest quotes from UZ home for manual extension table are walnut $2974 AUD and $2345 AUD for Congo/Smoked oak. Shangsheng is approx. $400 cheaper for walnut version. Shiyang currently working on the gas light/catch component for the nice to have feature. | POST SPRING | 4th November | 13th August | AMBER |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | TASMAN CHR | DINING |
| Samples with suppliers soon, currently reviewing Yabo drawings, so far suitable. DK has approved with improvements to the seat inlay. GL to send a steel seat frame to Yabo. Work on the sample from Yabo in GL to improve cover once received. Plan to have a seat insert manufactured in GL and assembled in Customers home. +/- 3mm tolerance on the chairs is achievable which will assist in this process. Aware it’s very risky and will be putting a lot of work into minimising risk in order to get max benefit. | SUMMER | May 4 | Mar | AMBER |
| |
@Pearson Bulmer (Unlicensed) @Ryan McGoldrick | MAGNOLIA TBL | DINING |
| design stage TBA Samples with suppliers soon. DK has approved to go ahead with suppliers (change timber horizontal to steel tube). Details and drawing to work through, requote with steel. -Consider as an extension table | POST AUTUMN | May 4 | Mar | RED |
| |
@Pearson Bulmer (Unlicensed) | MAX 2 | SOFA |
| Project on pause. DK mentioned on Monday Jan 23 what the status was on this project. | Not assigned | - | - | RED |
| |
@Pearson Bulmer (Unlicensed) | LIGHT TIMBER COLOUR OPTION/ Master stain update |
|
| Trying to create King master colours across the board, as well as new lighter colour. Pearson has ideas on using Ash instead of Red Oak across the board, it’s cheaper and more durable. Pearson will speak to GL team to get some sampling moving along. Cecco is remaking some samples, Oil based was used instead of water based, so needed to redo. Fingers crossed it will be faster this time (not 6 weeks like last time). Only Cecco currently looking at light timber option as they are our main solid timber supplier and they use the best water based finished. Veneer sample master underway with one supplier currently. Pearson will follow up. GL purchasing team assisting with this to try to bring all finishes into line together to match colours better. UZ samples underway to ensure timber finishes from them match.
|
|
|
|
|
|
|
| NEW SOFT FLEX ARM SOFA |
|
| @Tanya Rechberger to call DK and confirm the project kick off with Ryan and Pearson, Pearson holiday starts next week. |
|
|
|
|
|
|
ALAN’s Task List
| Completed | To do |
| Priority Order | Start Date | End Date |
---|---|---|---|---|---|---|
Alinta |
|
|
|
|
|
|
Tanya |
|
|
|
|
|
|
Pearson |
|
|
|
|
|
|
Jordan |
|
|
|
|
|
|
Sebastian |
|
|
|
|
|
|