Design Team 26/09/22 Meeting Minutes
Date | 26th of September 2022 |
Attendees | @Jordan Ruchalski (Unlicensed)@zara fong@Ned Volk (Unlicensed)@Alinta Lim@Chantelle Dunn@dominic.harrison |
2. Project Updates:
@Alinta Lim & @dominic.harrison
4 - Poster Bed
Completed | To do |
---|---|
@dominic.harrison Finish off mattress frame | Allan to cover bedhead this week. V1 complete, V2 underway |
GL to send out Veneer samples | @Ned Volk (Unlicensed) to create Gantt chart |
Johns to put on platform rail for the al frame to bed base | @dominic.harrison to organize more mosquito net. Make adjustments to mosquito proto. V1 complete, Allan doing final fabric version |
| RP extrusions have arrived and to be veneered |
Olive 1400
Completed | To do |
---|---|
| @Ned Volk (Unlicensed) to get marketing to format product information card |
Issho Console
Completed | To do |
---|---|
@Lauren Eskin (Unlicensed) to do instruction manual | @Ned Volk (Unlicensed) to chase up cylindo and deep etch |
@Alinta Lim information sheet |
|
@Alinta Lim to chase up image assets for managers meeting |
|
Morpheus
Completed | To do |
---|---|
@Alinta Lim chase up it has been entered into SAP - ENTERED |
|
Grant working on product cards, @Ned Volk (Unlicensed) to chase up | TU Engineering needs to approve flush leg ECN |
Grant has all information |
|
@Alinta Lim to work on instruction manual and product information sheet |
|
@Ned Volk (Unlicensed) to talk to e-commerce about cylindo |
|
Banksia
Completed | To do |
---|---|
Packaging and packing stickers signed-off, Banksia entered into SAP | @Ned Volk (Unlicensed) to continue to chase up product information sheet process |
@dominic.harrison to send through product information sheet to @Chantelle Dunn and @zara fong |
|
@Ned Volk (Unlicensed) to talk to marketing about product information sheet |
|
Dune bedside table
Completed | To do |
---|---|
@Alinta Lim to organize 2 drawer option to be prototyped | @Alinta Lim to chase up order |
@Alinta Lim to organize marble top prototype, carrara and marquina |
|
Platelet occasional table
Completed | To do |
---|---|
@dominic.harrison has found a mech and asked for samples | @Alinta Lim To redesign |
| Material selection needs to be evaluated |
| @dominic.harrison to manage GL purchasing team to organize sample of gas strut |
| Manolo, @dominic.harrison and @Alinta Lim to re define project |
Poolside (floating chair)
Completed | To do |
---|---|
@dominic.harrison & @Alinta Lim to get DK feedback | @Alinta Lim to prototype chair with dacron and pinch seam |
@dominic.harrison completed action plan to move forward | Re-revisit and refine internal construction |
| @dominic.harrison to create retail options presentation for Poolside |
Cabana
Completed | To do |
---|---|
@dominic.harrison & @Alinta Lim to get DK feedback, DK likes the cabana overall | @dominic.harrison to order magnetic fasteners |
@Alinta Lim and @dominic.harrison to refine design | @Alinta Lim to source carbon pole |
Seesaw Blind: @dominic.harrison to source magnetic and push pin fasteners | Frame to be completed on Wednesday 28/9 |
@Alinta Lim and @dominic.harrison to meet with engineering for testing | Phil to construct cushions, and Allan to upholster |
@dominic.harrison to organize John’s to modify platform and canopy extrusions | Shade system to be constructed later this week or next week |
@dominic.harrison to create drawing of new platform for johns to fabricate | Marketing Meeting Gameplan |
| @Dylan Dasey (Unlicensed) to finish CAD for the Cabana |
| Shade system to be upholstered later this week or next week |
| @Alinta Lim and @dominic.harrison to prepare documentation for manufacturing |
Director chair
Completed | To do |
---|---|
| @Ned Volk (Unlicensed) to look into manufacturing solution |
POS stands
Completed | To do |
---|---|
@dominic.harrison working on costings | Final sample is on the way by sea freight, for final approval |
@dominic.harrison working with SAP team to enter POS stands into SAP |
|
@dominic.harrison to reply to Kirsty |
|
@dominic.harrison to chase up Zoe for final samples |
|
Bellaire Legs & Base
Completed | To do |
---|---|
New bed base frame and new legs have been tested at GL | Platform changes at GL for prototype |
| @dominic.harrison to manage GL on making retrofittable new legs for old base |
| @dominic.harrison to prototype edging solution |
| @dominic.harrison & @Ned Volk (Unlicensed) for possible Bellaire leg paint solution |
| @Dylan Dasey (Unlicensed) to CAD knock-in to allow for 2-3mm tolerance |
| @dominic.harrison to review tests |
Outdoor Dining Chair - Compactor
Completed | To do |
---|---|
| Working on concepts and idea generation |
|
|
@Pearson Bulmer (Unlicensed) & Ryan Mcgoldrick
Heritage table
Completed | To do |
---|---|
@Pearson Bulmer (Unlicensed) to order American walnut, and materials for table | @Ned Volk (Unlicensed) to send Briggs an email for our requirements |
All materials arrived | @Pearson Bulmer (Unlicensed) to finish Heritage table CAD for parawood, Tony & GL Frank |
| @Pearson Bulmer (Unlicensed) to manufacture legs and 1 sample of table |
| Constructing mini samples for construction method |
Tasman Chair (fixed heritage chair)
Completed | To do |
---|---|
Present to DK on Tuesday 16/08 | @Pearson Bulmer (Unlicensed) to manage GL for 10 samples for photoshoot |
2 frames welded | Allan and Phil to refine for 2nd prototype |
Phils framing today, Allan to upholster | Pearson to create legs for proto |
@Pearson Bulmer (Unlicensed) to flesh out some chair refinements, johns to weld up and Allan to upholster | Approve Design with DK |
| Send design to GL for manufacture of photoshoot samples |
Magnolia Chair
Completed | To do |
---|---|
Secco sampling 2 chairs, @Pearson Bulmer (Unlicensed) to track, Secco completed | Thai supplier (Parawood) sampling chairs |
Secco samples due to arrive 12/09 |
|
Johns to weld frame and Allan to upholster once samples arrive |
|
Reviewed Secco Magnolia chair. Issues with Joining methods. Secco Magnolia chairs on hold |
|
Investment & Heritage Chair
Completed | To do |
---|---|
@Pearson Bulmer (Unlicensed) to order materials | Ryan to create CAD and improvements for chair |
John’s are to fabricate, @Pearson Bulmer (Unlicensed) to direct. |
|
Johns to finish welding |
|
Pearson to call DK for next steps/direction for the prototype chairs |
|
Magnolia Table
Completed | To do |
---|---|
| Design completed
|
MAX 2
Completed | To do |
---|---|
Sample on the way in sea freight | Start to create a handover doc |
@Pearson Bulmer (Unlicensed) to find sea freighted chair. |
|
Myco side table
Completed | To do |
---|---|
Samples have arrived at TU | @Ned Volk (Unlicensed) to review releasing Myco table with marketing and retail. |
Seymour seat
Completed | To do |
---|---|
Final Sample being airfreighted to TU | Engineering to approve the ECN |
@Pearson Bulmer (Unlicensed) to approve final sample once in TU |
|
@Mina Bassilious (Unlicensed) & @Jordan Ruchalski (Unlicensed)
Aura Light
Completed | To do |
---|---|
Mina review sample 17/08 |
|
TU to receive off tool samples |
|
Need to pay the invoice, @Ned Volk (Unlicensed) to chase up |
|
@Mina Bassilious (Unlicensed) and @Ned Volk (Unlicensed) interrogate marketing for naming |
|
Aura Pendant light
Completed | To do |
---|---|
@Mina Bassilious (Unlicensed) to create 3d to get DK approval | Prototyping at supplier |
@Mina Bassilious (Unlicensed) to send cad to supplier. Prototyping while Mina is away |
|
Pallino P light
Completed | To do |
---|---|
Received off tool sample | Manufacturing tooling, receive off tool parts @Mina Bassilious (Unlicensed) to track |
@Jordan Ruchalski (Unlicensed) to chase up glass tooling samples |
|
Luna indoor barstool
Completed | To do |
---|---|
Finance for Tooling for steel plate has been approved | @Mina Bassilious (Unlicensed) to review once sample has been completed per specification |
Timber version is being sampled and costed at at Secco | Charles has upholstered version to make changes |
Passed static load test | @Ned Volk (Unlicensed) to create marketing and flock conversation |
@Ned Volk (Unlicensed) to do price comparison |
|
Manufacture for the tool can now start |
|
Aluminum task light
Completed | To do |
---|---|
Supplier has prototyped task light version | Need to discuss costing and if we are to move forward |
@Mina Bassilious (Unlicensed) to complete CAD |
|
@Mina Bassilious (Unlicensed) to complete drawing documentation |
|
@Mina Bassilious (Unlicensed) to get invoice for tooling and have received BOM |
|
Elevate desk (sit stand desk)
Completed | To do |
---|---|
@Jordan Ruchalski (Unlicensed) to assemble prototype | Working with GL on electrical, waiting on motorized legs samples. GL has good motorized leg sample. @Jordan Ruchalski (Unlicensed) to get sent toy TU |
@Jordan Ruchalski (Unlicensed) to complete troubleshooting | @Jordan Ruchalski (Unlicensed) @Mina Bassilious (Unlicensed) to gather feedback |
@Dylan Dasey (Unlicensed) working on button interface | @Jordan Ruchalski (Unlicensed) to veneer the legs |
@Jordan Ruchalski (Unlicensed) to integrate the buttons | @Jordan Ruchalski (Unlicensed) to work on leg iterations |
| @Jordan Ruchalski (Unlicensed) to look into safety tech for jamming of body parts |
| Making prototype changes based on Manolo’s suggestions |
| Manufacturing pack to be completed after team review |
Making prototype changes based on Manolo’s suggestions
Round pendant
Completed | To do |
---|---|
DK has approved the direction | Team to do ideation for wireless remote control |
@Jordan Ruchalski (Unlicensed) to complete profile refinement exercise | Team to review mechanisms once in TU |
@zara fong @Jordan Ruchalski (Unlicensed) give direction for hanging mechs and find supplier. @zara fong to order samples | Need to discuss manufacturing process for round pendant |
Straight pendant
Completed | To do |
---|---|
DK has approved direction | Team to do ideation for wireless remote control |
Straight prototype has been cnc’d | @Jordan Ruchalski (Unlicensed) to prototype timber profile |
@Jordan Ruchalski (Unlicensed) to complete profile refinement exercise | Review mechanisms once in TU |
@zara fong @Jordan Ruchalski (Unlicensed) give direction for hanging mechs and find supplier. @zara fong to order samples |
|
Production cad completed |
|
Eto Desk & accessories
Completed | To do |
---|---|
@Mina Bassilious (Unlicensed) set up meeting with Tom to sign off on smaller details, meeting on the 20/07 | Tom Faraday to send light details |
@Jordan Ruchalski (Unlicensed) CNC Laptop stand this week, final prototype | While @Mina Bassilious (Unlicensed) is away pay for tooling, sample parts and create BOM |
@Mina Bassilious (Unlicensed) Working on the electrical specification document completed for desk | @Ned Volk (Unlicensed) to get costing for the ETO, send BOM to @Jordan Ruchalski (Unlicensed) |
@Mina Bassilious (Unlicensed) to finish CAD and to get Tom to review |
|
@Ned Volk (Unlicensed) to send @Mina Bassilious (Unlicensed) to send ROI template |
|
Tom to review |
|
@Mina Bassilious (Unlicensed) to prepare documents for long lead time tools, after Tom approves |
|
@Mina Bassilious (Unlicensed) to create manufacturing pack |
|
@Jordan Ruchalski (Unlicensed) working on new equipment and prototyping area
@Jordan Ruchalski (Unlicensed) to finish off drawings for 3d printer shield and send to aluminium profile company
@Tanya Rechberger & @zara fong
Curve sofa
Completed | To do |
---|---|
@Tanya Rechberger to make changes to compact occasional chair, John’s to modify until it goes together | Allan to upholster compact occasional chair |
| @Tanya Rechberger to review of netting fabric vs sheet metal |
| @Tanya Rechberger and @zara fong to meet with DK to create direction of curve sofa |
Outdoor Curve Sofa
Completed | To do |
---|---|
| Allan has plastic to prototype outdoor version - wait for occasional chair updates |
Quay Dining Chair
Completed | To do |
---|---|
GL to send samples to be assessed. Direction will be dictated from sample review. | @Tanya Rechberger to continue iterating design |
GL sample here, design team to review | GL are prototyping |
Kato sofa
Completed | To do |
---|---|
@Tanya Rechberger to catch up with DK over the firmer seat option | @Tanya Rechberger to prototype firmer seat option |
Jasper 20th Anniversary
Completed | To do |
---|---|
@Tanya Rechberger review whether new timber shelf is the right way forward… CANNED | @zara fong to start Ideation for smart pockets |
Tanya has asked GL to start sampling corner module | Corner module approved by DK, @Tanya Rechberger to start sampling, in possibly package 1A. |
End ottoman CANNED | @Tanya Rechberger reiterating new component package ideas |
Team to continue ideating lights in shelf concept | @Tanya Rechberger to begin development on premium firm foam |
Ordered Jasper Sample | @Tanya Rechberger to start Light research and ideation |
| @zara fong to prototype light shelf idea |
| @zara fong has made drawings for corner module and to hand over to John |
| @Tanya Rechberger to coordinate foam prototyping for new module with Phil |
| @Tanya Rechberger and @zara fong to trial bolster idea once Jasper sample arrives |
New Armchair
Completed | To do |
---|---|
Dk likes the idea | @Tanya Rechberger and @Ned Volk (Unlicensed) to create PID |
Quay Barstool Bar Height
Completed | To do |
---|---|
@zara fong to review current height of barstool | @Ned Volk (Unlicensed) @zara fong to complete PID |
GL have completed testing | @zara fong and @Tanya Rechberger to asses the testing that GL have completed |
At GL for prototyping and testing |
|
3 samples coming from GL |
|
Pillow
Completed | To do |
---|---|
@zara fong has created pattern | @zara fong to reiterate covers |
@zara fong to make Cover | @zara fong To complete testing for the pillow |
Other
Fleur Tub chair
Completed | To do |
---|---|
@Ned Volk (Unlicensed) chased up Cylindo, waiting on ecomm IT team |
|
|
|
Desk Accessory
Completed | To do |
---|---|
Pushed back to be released with Elevate Desk. @Ned Volk (Unlicensed) has communicated | GL making prototypes 2nd set. @Lauren Eskin (Unlicensed) to work with GL to iterate |
| @Lauren Eskin (Unlicensed) to complete TU Prototype |
|
|
@Chantelle Dunn
Completed | To do |
---|---|
| Product Wiki - Sorting through emails to add to product wiki - Up to October 2021 |
|
|
|
|