Date | 12th of September 2022 |
Attendees | Pearson Bulmer (Unlicensed) Jordan Ruchalski (Unlicensed) zara fong Ned Volk (Unlicensed) Lauren Eskin (Unlicensed) Alinta Lim Tanya Rechberger Chantelle Dunn dominic.harrison |
2. Project Updates:
Alinta Lim & dominic.harrison
4 - Poster Bed
Completed | To do |
---|---|
Ned Volk (Unlicensed) dominic.harrison Alinta Lim to assign bed to a sale | Allan to cover bedhead this week |
dominic.harrison to organize prototype mosquito net options, Allan is currently sewing | GL to send out Veneer samples, Waiting on RP extrusions to arrive and to be veneered |
Phil to manufacture bedhead under the direction of dominic.harrison . Allan to start this or next week | Johns to put on platform rail for the al frame to bed base |
Phil to manufacture bedhead under the direction of dominic.harrison . | Ned Volk (Unlicensed) to create Gantt chart |
Shiyang to send pictures of veneered sample before posting. | dominic.harrison to organize more mosquito net. Make adjustments to mosquito proto |
dominic.harrison Finish off mattress frame | dominic.harrison to organize more mosquito net. Make adjustments to mosquito proto |
Olive 1400
Completed | To do |
---|---|
Ned Volk (Unlicensed) to get marketing to format product information card |
Issho Console
Completed | To do |
---|---|
Lauren Eskin (Unlicensed) to do instruction manual | Ned Volk (Unlicensed) to chase up cylindo and deep etch |
Alinta Lim information sheet | |
Alinta Lim to chase up image assets for managers meeting |
Morpheus
Completed | To do |
---|---|
Alinta Lim chase up it has been entered into SAP | Alinta Lim chase up it has been entered into SAP again |
Grant working on product cards, Ned Volk (Unlicensed) to chase up | TU Engineering needs to approve flush leg ECN |
Grant has all information | Ned Volk (Unlicensed) to talk to e-commerce about cylindo |
Alinta Lim to work on instruction manual and product information sheet |
Banksia
Completed | To do |
---|---|
Packaging and packing stickers signed-off, Banksia entered into SAP | Ned Volk (Unlicensed) to continue to chase up product information sheet process |
dominic.harrison to send through product information sheet to Chantelle Dunn and zara fong | |
Ned Volk (Unlicensed) to talk to marketing about product information sheet |
Dune bedside table
Completed | To do |
---|---|
Alinta Lim to organize 2 drawer option to be prototyped | Alinta Lim to chase up order |
Alinta Lim to organize marble top prototype, carrara and marquina |
Platelet occasional table
Completed | To do |
---|---|
dominic.harrison has found a mech and asked for samples | Alinta Lim To redesign |
Material selection needs to be evaluated | |
dominic.harrison to manage GL purchasing team to organize sample of gas strut | |
Manolo, dominic.harrison and Alinta Lim to re define project |
Poolside (floating chair)
Completed | To do |
---|---|
dominic.harrison & Alinta Lim to get DK feedback | Alinta Lim to prototype chair with dacron and pinch seam |
dominic.harrison completed action plan to move forward | Re-revisit and refine internal construction |
dominic.harrison to create retail options presentation for Poolside |
Cabana
Completed | To do |
---|---|
dominic.harrison & Alinta Lim to get DK feedback, DK likes the cabana overall | dominic.harrison to order magnetic fasteners |
Alinta Lim and dominic.harrison to refine design | Alinta Lim to source carbon pole |
Seesaw Blind: dominic.harrison to source magnetic and push pin fasteners | Alinta Lim and dominic.harrison to meet with engineering for testing |
Engineering team needs to begin testing on drain through system | |
Alinta Lim and dominic.harrison to prepare documentation for manufacturing | |
Marketing Meeting gameplan | |
Dylan Dasey (Unlicensed) to finish CAD for the Cabana | |
dominic.harrison to organize John’s to modify platform and canopy extrusions | |
dominic.harrison to create drawing of new platform for johns to fabricate |
Director chair
Completed | To do |
---|---|
Ned Volk (Unlicensed) to look into manufacturing solution |
POS stands
Completed | To do |
---|---|
dominic.harrison to make physical changes and send to Kirsty and DK for review | dominic.harrison working on costings |
dominic.harrison to take ends off skinny stand | dominic.harrison working with SAP team to enter POS stands into SAP |
dominic.harrison to get confirmation from DK | dominic.harrison to chase up Zoe for final samples |
dominic.harrison to reply to Kirsty |
Bellaire Legs & Base
Completed | To do |
---|---|
New bed base frame and new legs have been tested at GL | Platform changes at GL for prototype |
dominic.harrison to manage GL on making retrofittable new legs for old base | |
dominic.harrison to prototype edging solution | |
dominic.harrison & Ned Volk (Unlicensed) for possible Bellaire leg paint solution | |
Dylan Dasey (Unlicensed) to CAD knock-in to allow for 2-3mm tolerance | |
dominic.harrison to review tests |
Pumice Ceramic
Completed | To Do |
---|---|
Alinta Lim to drive decision, to present options to Tony (Unlicensed) | Need to order this week, going to run out of pumice in 3 weeks |
Ceramic Review meeting required. Supplier has agreed to lower MOQ run |
Pearson Bulmer (Unlicensed)
Heritage table
Completed | To do |
---|---|
Pearson Bulmer (Unlicensed) to order American walnut, and materials for table | Pearson Bulmer (Unlicensed) to send Briggs an email for our requirements |
All materials arrived | Pearson Bulmer (Unlicensed) to finish Heritage table CAD for parawood, Tony & GL Frank |
Pearson Bulmer (Unlicensed) to manufacture legs and 1 sample of table | |
Tasman Chair (fixed heritage chair)
Completed | To do |
---|---|
Present to DK on Tuesday 16/08 | Pearson Bulmer (Unlicensed) to manage GL for 10 samples for photoshoot |
2 frames welded | Allan and Phil to refine for 2nd prototype |
Phils framing today, Allan to upholster | Pearson to create legs for proto |
Pearson Bulmer (Unlicensed) to flesh out some chair refinements, johns to weld up and Allan to upholster | Approve Design with DK |
Send design to GL for manufacture of photoshoot samples |
Magnolia Chair
Completed | To do |
---|---|
Secco sampling 2 chairs, Pearson Bulmer (Unlicensed) to track, Secco completed | Thai supplier sampling chairs |
Secco samples due to arrive 12/09 | |
Johns to weld frame and Allan to upholster once samples arrive |
Investment & Heritage Chair
Completed | To do |
---|---|
Pearson Bulmer (Unlicensed) to order materials | John’s are to fabricate, Pearson Bulmer (Unlicensed) to direct. |
| Johns to finish welding |
Pearson to call DK for next steps/direction for the prototype chairs |
Magnolia Table
Completed | To do |
---|---|
Design completed
|
MAX 2
Completed | To do |
---|---|
Sample on the way in sea freight | Start to create a handover doc |
Pearson Bulmer (Unlicensed) to find sea freighted chair. |
Myco side table
Completed | To do |
---|---|
Samples have arrived at TU | Ned Volk (Unlicensed) to review releasing Myco table with marketing and retail. |
Seymour seat
Completed | To do |
---|---|
Final Sample being airfreighted to TU | Engineering to approve the ECN |
Pearson Bulmer (Unlicensed) to approve final sample once in TU |
Mina Bassilious (Unlicensed) & Jordan Ruchalski (Unlicensed)
Aura Light
Completed | To do |
---|---|
Mina review sample 17/08 | Ned Volk (Unlicensed) to chase up the assets required for this |
TU to receive off tool samples | |
Need to pay the invoice, Ned Volk (Unlicensed) to chase up | |
Mina Bassilious (Unlicensed) and Ned Volk (Unlicensed) interrogate marketing for naming |
Aura Pendant light
Completed | To do |
---|---|
Mina Bassilious (Unlicensed) to create 3d to get DK approval | Prototyping at supplier |
Mina Bassilious (Unlicensed) to send cad to supplier. Prototyping while Mina is away |
Pallino P light
Completed | To do |
---|---|
Received off tool sample | Manufacturing tooling, receive off tool parts Mina Bassilious (Unlicensed) to track |
Jordan Ruchalski (Unlicensed) to chase up glass tooling samples |
Luna indoor barstool
Completed | To do |
---|---|
Finance for Tooling for steel plate has been approved | Mina Bassilious (Unlicensed) to review once sample has been completed per specification |
Timber version is being sampled and costed at at Secco | Charles has upholstered version to make changes |
Passed static load test | Manufacture for the tool can now start |
Ned Volk (Unlicensed) to do price comparison |
Aluminum task light
Completed | To do |
---|---|
Supplier has prototyped task light version | Mina Bassilious (Unlicensed) to get invoice for tooling |
Mina Bassilious (Unlicensed) to complete CAD | Ned Volk (Unlicensed) to catch up coffey to review cast aluminum cad |
Mina Bassilious (Unlicensed) to complete drawing documentation |
Elevate desk (sit stand desk)
Completed | To do |
---|---|
Jordan Ruchalski (Unlicensed) to assemble prototype | Working with GL on electrical, waiting on motorized legs samples. GL has good motorized leg sample. Jordan Ruchalski (Unlicensed) to get sent toy TU |
Jordan Ruchalski (Unlicensed) to complete troubleshooting | Jordan Ruchalski (Unlicensed) Mina Bassilious (Unlicensed) to gather feedback |
Dylan Dasey (Unlicensed) working on button interface | Jordan Ruchalski (Unlicensed) to veneer the legs |
Jordan Ruchalski (Unlicensed) to integrate the buttons | |
Jordan Ruchalski (Unlicensed) to work on leg iterations | |
Jordan Ruchalski (Unlicensed) to look into safety tech for jamming of body parts | |
Making prototype changes based on Manolo’s suggestions |
Round pendant
Completed | To do |
---|---|
DK has approved the direction | Team to do ideation for wireless remote control |
Jordan Ruchalski (Unlicensed) to complete profile refinement exercise | Team to review mechanisms once in TU |
zara fong Jordan Ruchalski (Unlicensed) give direction for hanging mechs and find supplier. zara fong to order samples |
Straight pendant
Completed | To do |
---|---|
DK has approved direction | Team to do ideation for wireless remote control |
Straight prototype has been cnc’d | Jordan Ruchalski (Unlicensed) to prototype timber profile |
Jordan Ruchalski (Unlicensed) to complete profile refinement exercise | Review mechansisms one in TU |
zara fong Jordan Ruchalski (Unlicensed) give direction for hanging mechs and find supplier. zara fong to order samples |
Eto Desk & accessories
Completed | To do |
---|---|
Mina Bassilious (Unlicensed) set up meeting with Tom to sign off on smaller details, meeting on the 20/07 | Tom Faraday to send light details |
Jordan Ruchalski (Unlicensed) CNC Laptop stand this week, final prototype | While Mina Bassilious (Unlicensed) is away pay for tooling, sample parts and create BOM |
Mina Bassilious (Unlicensed) Working on the electrical specification document completed for desk | Ned Volk (Unlicensed) to get costing for the ETO, send BOM to Jordan Ruchalski (Unlicensed) |
Mina Bassilious (Unlicensed) to finish CAD and to get Tom to review | |
Ned Volk (Unlicensed) to send Mina Bassilious (Unlicensed) to send ROI template | |
Tom to review | |
Mina Bassilious (Unlicensed) to prepare documents for long lead time tools, after Tom approves | |
Mina Bassilious (Unlicensed) to create manufacturing pack |
Jordan Ruchalski (Unlicensed) working on new equipment and prototyping area
Jordan Ruchalski (Unlicensed) to finish off drawings for 3d printer shield and send to aluminium profile company
Tanya Rechberger & zara fong
Curve sofa
Completed | To do |
---|---|
Tanya Rechberger to make changes to compact occasional chair, John’s to modify until it goes together | Allan to upholster compact occasional chair |
Tanya Rechberger to review of netting fabric vs sheet metal | |
Outdoor Curve Sofa
Completed | To do |
---|---|
Allan has plastic to prototype outdoor version - wait for occasional chair updates |
Quay Dining Chair
Completed | To do |
---|---|
GL to send samples to be assessed. Direction will be dictated from sample review. | Tanya Rechberger to continue iterating design |
GL sample here, design team to review | GL are prototyping |
Kato sofa
Completed | To do |
---|---|
Tanya Rechberger to catch up with DK over the firmer seat option | Tanya Rechberger to prototype firmer seat option |
Jasper 20th Anniversary
Completed | To do |
---|---|
Tanya Rechberger review whether new timber shelf is the right way forward… CANNED | zara fong and Lauren Eskin (Unlicensed) to start Ideation for smart pockets |
Tanya has asked GL to start sampling corner module | Corner module approved by DK, Tanya Rechberger to start sampling, in possibly package 1A. |
End ottoman CANNED | Tanya Rechberger reiterating new component package ideas |
Team to continue ideating lights in shelf concept | Tanya Rechberger to begin development on premium firm foam |
Ordered Jasper Sample | Tanya Rechberger to start Light research and ideation |
zara fong to prototype light shelf idea | |
zara fong has made drawings for corner module and to hand over to John | |
Tanya Rechberger to coordinate foam prototyping for new module with Phil | |
Tanya Rechberger and zara fong to trial bolster idea once Jasper sample arrives |
New Armchair
Completed | To do |
---|---|
Dk likes the idea | Tanya Rechberger and Ned Volk (Unlicensed) to create PID |
Quay Barstool Bar Height
Completed | To do |
---|---|
zara fong to review current height of barstool | Ned Volk (Unlicensed) zara fong to complete PID |
GL have completed testing | zara fong and Tanya Rechberger to asses the testing that GL have completed |
At GL for prototyping and testing |
Pillow
Completed | To do |
---|---|
zara fong has created pattern | zara fong to reiterate covers |
zara fong to make Cover | zara fong To complete testing for the pillow |
Other
Fleur Tub chair
Completed | To do |
---|---|
Ned Volk (Unlicensed) chased up Cylindo, waiting on ecomm IT team | |
Desk Accessory
Completed | To do |
---|---|
Pushed back to be released with Elevate Desk. Ned Volk (Unlicensed) has communicated | GL making prototypes 2nd set. Lauren Eskin (Unlicensed) to work with GL to iterate |
Lauren Eskin (Unlicensed) to complete TU Prototype | |
Chantelle Dunn
Completed | To do |
---|---|
Product Wiki - Sorting through emails to add to product wiki - Up to August 2021 | |