MISCELLANEOUS TASK LIST:

  1. Send Coffey: Solair, Lume and Faro pocket accessory packaging updates. ALl must have sub text. Ie Lume - Smart Light, Faro - Pocket Accessory, Solair - Pocket Accessory. Small text 8pt or larger. Refer to Ester files. Onyx not congo. Update CA plug graphic to be accurate https://cdn.authentik.com/canada/uploads/images/orig/bon-a-savoir/fiche-courant-electrique-canada.jpg

  2. Ask Coffey and James about US certification. Attach Melinda’s document. List products currently on sale and in development. What do we need for introduction?

  3. Sea freight galvanised Luna Dining Chair to TU

  4. Luma Light 2.0 - implement ideas and features from discussions with Coffey

  5. Visit couple of showrooms and review Luna Dining Chair mesh. Request reflock if necessary.

  6. Update Luna Dining Chair product card with rope arm detail

  7. Lighting QC checklists

  8. Documents for Lume Light head spare part + packaging

  9. Sand blasting chamber - use Ryan 3D printed link

  10. Source more hardware storage boxes and mount to the wall above fire extinguishers

  11. Timber scrap storage rack on brick wall next to dust extractor https://www.pinterest.com.au/pin/534309943271626748/

GL PROJECTS:

Table processor
macroMarker1678257161184_341
serialized[{"treeAlias":1,"index":0,"isActive":true,"type":"chart","params":{"type":"Pie","column":"RESPONSIBILITY‚PROJECT‚% COMPLETE‚RISK","aggregation":"No.","ytitle":"RESPONSIBILITY","xtitle":"No.","pieKeys":"ZOE WANG‚SHIYANG‚ETO DESK‚ELEVATE DESK‚LUNA UPH BAR‚LUNA UPH COUNTER‚LUNA TIM COUNTER‚LUNA OUT COUNTER‚50%‚100%‚25%‚R‚G‚Y","datepattern":"dd M yy","formatVersion":"3","colors":"#f6c342,#8cc3e9,#3572b0,#f6c342,#654982,#e98125,#2484c1,#65a620,#2484c1,#8eb021,#e98125,#d04437,#65a620,#f6c342","version":"2","barColoringType":"multi","separator":"Point (.)","macroMarker":"1678257161183_931","tfc-height":"300","tfc-width":"","hide":"false","colorColumns":"","line-settings":"undefined","interpolation":"undefined","is3d":"false","lineSettings":"undefined","innerLabels":"Value","ganttArrows":"%7B%7D"},"child":[{"treeAlias":10,"isActive":false,"type":"filter","params":{"fixedCols":"","totalrow":"","hidelabels":"false","ddSeparator":"","sparkName":"Sparkline","hidePane":"Table header","tabs":"false","limitHeight":"","sparkline":"false","macroMarker":"1678254089567_209","default":",,,","hideColumns":"false","cell-width":"150,150,150,150","totalRowName":"","totalColName":"","disabled":"false","globalFilter":"true","formatVersion":"2","iconfilter":"","order":"2,0,1,3","hideControls":"false","numbering":"","inverse":"false,false,false,false","datefilter":"","column":"RESPONSIBILITY","totalcol":"","sort":"","isNew":"false","disableSave":"false","rowsPerPage":"","separator":"Point (.)","labels":"RESPONSIBILITY‚RISK‚PROBLEM STATEMENT/RISK‚Filter whole table","thousandSeparator":"","ignoreFirstNrows":"","ddOperator":"","userfilter":"RISK,PROBLEM STATEMENT/RISK","numberfilter":"","datepattern":"d M yy","heightValue":"","updateSelectOptions":"false","worklog":"365|5|8|y w d h m|y w d h m","isOR":"AND"},"child":[{"treeAlias":100,"isActive":false,"type":"table","params":{"index":0},"child":[]}]}]}]

PROJECT

No.

OPEN DATE

RISK

TOPIC

STATEMENT

ACTION

RESPONSIBILITY

PLANNED CLOSED DATE

ACTUAL CLOSE DATE

% COMPLETE

DIRECTORS CHAIRPROJECT 01

1

Y

Update knockins and tool new ones

Awaiting CAPEX raise and payment for new knockins. And supplier to complete tolerance update for existing

Follow up with Zoe

ZOETopic

Statement

Action

PERSON 01

TBD

25%

ETO DESKPROJECT 01

1

Y

Cable clip + cable holder tooling

CAPEX paid, waiting completed of parts

Follow up with Zoe

ZOETopic

Statement

Action

PERSON 01

TBD

25%

ELEVATE DESKPROJECT 02

1

Y

M2 electrical updates

Need new wiring harness and sample that implements updates. Most notably ZETR GPO

Follow up with Shiyang

SHIYANGTopic

Statement

Action

PERSON 02

TBD

25%

ELEVATE DESKPROJECT 02

1

Y

Oval extrusion tooling and production

Need CAPEX raised, tool produced and part sampled

Follow up with Shiyang

SHIYANGTopic

Statement

Action

PERSON 02

TBD

25%

ELEVATE DESKPROJECT 03

1

Y

Plastic leg flange tooling and production

Need CAPEX raised, tool produced and part sampled

Follow up with Shiyang

SHIYANGTopic

Statement

Action

PERSON 03

TBD

25%

INFINITELUX PROJECTS:

Table chart
tfc-width
barColoringTypemulti
innerLabelsValue
colorColumns
columnRESPONSIBILITY‚PROJECT:‚% COMPLETE‚RISK
is3dfalse
aggregationNo.
typeDonut
version2
separatorPoint (.)
colors#f6c342,#a3acb2,#d04437,#3572b0,#f6c342,#e4a14b,#65a620,#e4a14b,#f6c342,#cc1010,#8eb021,#65a620,#f6c342,#d04437
line-settingsundefined
macroMarker1678315464735_187
ytitlePROJECT:
hidefalse
interpolationundefined
tfc-height300
pieKeysCOFFEY SHEN‚PALLINO PORTABLE‚AURA PENDANT‚SOLAIR‚HELIO‚ETO TASK LIGHT‚ETO TABLE LAMP‚75%‚50%‚25%‚100%‚G‚Y‚R
xtitleCount
datepatterndd M yy
formatVersion3
lineSettingsundefined
ganttArrows%7B%7D

PROJECT:

No.

OPEN DATE

RISK

TOPIC

STATEMENT

ACTION

RESPONSIBILITY

PLANNED CLOSED DATE

ACTUAL CLOSE DATE

% COMPLETE

SOLAIRPROJECT 01

1

Y

Photography samples

Awaiting photography samples that include updated feedback

Follow up with Coffey

COFFEY SHENTopic

Statement

Action

PERSON 01

TBD

25%

ETO TASK LIGHTPROJECT 02

1

Y

Second sample

Awaiting completion of updated sample implementing feedback on first

Follow up with Coffey

COFFEY SHENTopic

Statement

Action

PERSON 02

TBD

25%

ETO TABLE LAMPPROJECT 03

1

Y

Second sample

Awaiting completion of updated sample implementing feedback on first

Follow up with Coffey

COFFEY SHENTopic

Statement

Action

PERSON 03

TBD

25%

PRODUCTION CHECKLIST:

  •  

LUNA

OUTDOORN/A
1

PACKAGING CAD
PACKAGING DOCS
(SHARE WITH GRANT)
ASSEMBLY INSTRUCTIONS
(SHARE WITH GRANT)
PRODUCT CARD
(SHARE WITH GRANT)
COSTINGS
(BOM)
SAP DATA
(SHARE WITH KITTY)
PRICING
FLOCK
ORDER
SPARE
PARTS
DESIGN DISCLOSURE DOCUMENT + REGISTRATION DRAWINGS
CYLINDO
DEEP
ETCH
PHOTOS
LIFESTYLE
PHOTOS
PRODUCTION ORDER
PRODUCT INFO SHEET
2

INFINITELUX PROJECTS:

3

FIREFLY
LANTERN

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
4

SOLAIR

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
5

HELIO

STRAIGHT

PENDANT

  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •  
6

HELIO

ROUND

PENDANT

  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •  
7

HELIO MODULAR

  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •  
8

ETO

TASK

LIGHT

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
9

ETO

TABLE

LAMP

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
10

GL PROJECTS:

11

PACKAGING CAD
PACKAGING DOCS
(SHARE WITH GRANT)
ASSEMBLY INSTRUCTIONS
(SHARE WITH GRANT)
PRODUCT CARD
(SHARE WITH GRANT)
COSTINGS (BOM)
SAP DATA
(SHARE WITH KITTY)
PRICING
FLOCK
ORDER
SPARE
PARTS
DESIGN DISCLOSURE DOCUMENT + REGISTRATION DRAWINGS
CYLINDO
DEEP
ETCH
PHOTOS
LIFESTYLE
PHOTOS
PRODUCTION ORDER
PRODUCT INFO SHEET
12

DIRECTORS

CHAIR

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
13

SWIVEL DINING

CHAIR

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
14

ETO

DESK

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
15

ETO

ACCESSORIES

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
16

ELEVATE

DESK

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

  •  
  •  
  •  
  •  
  •  
17

COUNTERSTOOL

N/A

N/A

N/A

  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
18

LUNA

OUTDOOR

BARSTOOL

N/A

N/A

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •