WEEKLY TASK LIST:

WEEKLY MEETING AGENDA:

  1. Review the list each meeting to resolve any issues

  2. Set achievable targets for the following week

  3. Mina will send out weekly worklist

  4. Mina will update progress on Jira and Confluence

PROJECT ARCHIVE:

ELEMENT TABLE

OFFICE CHAIR

ADJUSTABLE FLOOR LAMP

GRACE CABINET

MISCELLANEOUS TASK LIST:

  1. Ask Coffey and James about US certification. Attach Melinda’s document. List products currently on sale and in development. What do we need for introduction?

  2. Sea freight galvanised Luna Dining Chair to TU

  3. Luma Light 2.0 - implement ideas and features from discussions with Coffey

  4. Visit couple of showrooms and review Luna Dining Chair mesh. Request reflock if necessary.

  5. Update Luna Dining Chair product card with rope arm detail

  6. Lighting QC checklists

  7. Documents for Lume Light head spare part + packaging

  8. Sand blasting chamber - use Ryan 3D printed link

  9. Source more hardware storage boxes and mount to the wall above fire extinguishers

  10. Timber scrap storage rack on brick wall next to dust extractor https://www.pinterest.com.au/pin/534309943271626748/

GL PROJECTS:

Table processor
macroMarker1678257161184_341
serialized[{"treeAlias":1,"index":0,"isActive":true,"type":"chart","params":{"type":"Pie","column":"RESPONSIBILITY‚PROJECT‚% COMPLETE‚RISK","aggregation":"No.","ytitle":"RESPONSIBILITY","xtitle":"No.","pieKeys":"ZOE WANG‚SHIYANG‚ETO DESK‚ELEVATE DESK‚LUNA UPH BAR‚LUNA UPH COUNTER‚LUNA TIM COUNTER‚LUNA OUT COUNTER‚50%‚100%‚25%‚R‚G‚Y","datepattern":"dd M yy","formatVersion":"3","colors":"#f6c342,#8cc3e9,#3572b0,#f6c342,#654982,#e98125,#2484c1,#65a620,#2484c1,#8eb021,#e98125,#d04437,#65a620,#f6c342","version":"2","barColoringType":"multi","separator":"Point (.)","macroMarker":"1678257161183_931","tfc-height":"300","tfc-width":"","hide":"false","colorColumns":"","line-settings":"undefined","interpolation":"undefined","is3d":"false","lineSettings":"undefined","innerLabels":"Value","ganttArrows":"%7B%7D"},"child":[{"treeAlias":10,"isActive":false,"type":"filter","params":{"fixedCols":"","totalrow":"","hidelabels":"false","ddSeparator":"","sparkName":"Sparkline","hidePane":"Table header","tabs":"false","limitHeight":"","sparkline":"false","macroMarker":"1678254089567_209","default":",,,","hideColumns":"false","cell-width":"150,150,150,150","totalRowName":"","totalColName":"","disabled":"false","globalFilter":"true","formatVersion":"2","iconfilter":"","order":"2,0,1,3","hideControls":"false","numbering":"","inverse":"false,false,false,false","datefilter":"","column":"RESPONSIBILITY","totalcol":"","sort":"","isNew":"false","disableSave":"false","rowsPerPage":"","separator":"Point (.)","labels":"RESPONSIBILITY‚RISK‚PROBLEM STATEMENT/RISK‚Filter whole table","thousandSeparator":"","ignoreFirstNrows":"","ddOperator":"","userfilter":"RISK,PROBLEM STATEMENT/RISK","numberfilter":"","datepattern":"d M yy","heightValue":"","updateSelectOptions":"false","worklog":"365|5|8|y w d h m|y w d h m","isOR":"AND"},"child":[{"treeAlias":100,"isActive":false,"type":"table","params":{"index":0},"child":[]}]}]}]

PROJECT

No.

OPEN DATE

RISK

TOPIC

STATEMENT

ACTION

RESPONSIBILITY

PLANNED CLOSED DATE

ACTUAL CLOSE DATE

% COMPLETE

DIRECTORS CHAIR

1

Y

Update knockins and tool new ones

Awaiting CAPEX raise and payment for new knockins. And supplier to complete tolerance update for existing

Follow up with Zoe

ZOE

TBD

25%

DIRECTORS CHAIR

1

Y

Complete sample

Awaiting complete sample of the chair to review with the team and DK

Follow up with Zoe

ZOE

TBD

25%

DIRECTORS CHAIR

1

Y

Packaging sample

Awaiting sample of drawstring bag and cardboard box at GL

Follow up with Zoe

ZOE

TBD

25%

ETO DESK

1

Y

Cable clip + cable holder tooling

CAPEX paid, waiting completed of parts

Follow up with Zoe

ZOE

TBD

25%

ETO DESK

1

Y

Mains power housing tooling

Awiting production of custom part. Tooling CAPEX approved

Follow up with Zoe

ZOE

TBD

50%

ETO DESK

1

Y

Die cast rail tooling

Awaiting implementation of update

Follow up with Zoe

ZOE

TBD

50%

ELEVATE DESK

1

Y

M2 electrical updates

Need new wiring harness and sample that implements updates. Most notably ZETR GPO

Follow up with Shiyang

SHIYANG

TBD

25%

ELEVATE DESK

1

Y

Oval extrusion tooling and production

Need CAPEX raised, tool produced and part sampled

Follow up with Shiyang

SHIYANG

TBD

25%

ELEVATE DESK

1

Y

Plastic leg flange tooling and production

Need CAPEX raised, tool produced and part sampled

Follow up with Shiyang

SHIYANG

TBD

25%

LUNA OUT BAR

1

Y

Complete sample with pressed mesh tooling

Need new welding jig produced. To make complete sample with seat geometry matching the counterstool

Follow up with Shengming

SHIYANG

TBD

25%

INFINITELUX PROJECTS:

Table chart
tfc-width
barColoringTypemulti
innerLabelsValue
colorColumns
columnRESPONSIBILITY‚PROJECT:‚% COMPLETE‚RISK
is3dfalse
aggregationNo.
typeDonut
version2
separatorPoint (.)
colors#f6c342,#a3acb2,#d04437,#3572b0,#f6c342,#e4a14b,#65a620,#e4a14b,#f6c342,#cc1010,#8eb021,#65a620,#f6c342,#d04437
line-settingsundefined
macroMarker1678315464735_187
ytitlePROJECT:
hidefalse
interpolationundefined
tfc-height300
pieKeysCOFFEY SHEN‚PALLINO PORTABLE‚AURA PENDANT‚SOLAIR‚HELIO‚ETO TASK LIGHT‚ETO TABLE LAMP‚75%‚50%‚25%‚100%‚G‚Y‚R
xtitleCount
datepatterndd M yy
formatVersion3
lineSettingsundefined
ganttArrows%7B%7D

PROJECT:

No.

OPEN DATE

RISK

TOPIC

STATEMENT

ACTION

RESPONSIBILITY

PLANNED CLOSED DATE

ACTUAL CLOSE DATE

% COMPLETE

SPIA PENDANT

1

Y

Production order

Awaiting completion of first production order

Follow up with Coffey

COFFEY SHEN

TBD

25%

SOLAIR

1

Y

Updated sample

Awaiting complettion of updated sample

Follow up with Coffey

COFFEY SHEN

TBD

25%

SOLAIR

1

Y

Photography samples

Awaiting photography samples that include updated feedback

Follow up with Coffey

COFFEY SHEN

TBD

25%

ETO TASK LIGHT

1

Y

Second sample

Awaiting completion of updated sample implementing feedback on first

Follow up with Coffey

COFFEY SHEN

TBD

25%

ETO TABLE LAMP

1

Y

Second sample

Awaiting completion of updated sample implementing feedback on first

Follow up with Coffey

COFFEY SHEN

TBD

25%

PRODUCTION CHECKLIST:

1

PACKAGING CAD
PACKAGING DOCS
(SHARE WITH GRANT)
ASSEMBLY INSTRUCTIONS
(SHARE WITH GRANT)
PRODUCT CARD
COSTINGS (BOM)
SAP
PRICING
FLOCK
ORDER
SPARE
PARTS
DESIGN DISCLOSURE DOCUMENT + REGISTRATION DRAWINGS
CYLINDO
DEEP
ETCH
PHOTOS
LIFESTYLE
PHOTOS
PRODUCTION ORDER
PRODUCT INFO SHEET
2

INFINITELUX PROJECTS:

3

FIREFLY
LANTERN

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
4

FARO

PENDANT

  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

N/A

  •  
  •  
  •  
  •  
  •  
  •  
5

SOLAIR

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
65

HELIO

STRAIGHT

PENDANT

  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •  
76

HELIO

ROUND

PENDANT

  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •  
87

HELIO MODULAR

  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •  
98

ETO

TASK

LIGHT

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
109

ETO

TABLE

LAMP

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
1110

GL PROJECTS:

1211

PACKAGING CAD
PACKAGING DOCS
(SHARE WITH GRANT)
ASSEMBLY INSTRUCTIONS
(SHARE WITH GRANT)
PRODUCT CARD
COSTINGS (BOM)
SAP
PRICING
FLOCK
ORDER
SPARE
PARTS
DESIGN DISCLOSURE DOCUMENT + REGISTRATION DRAWINGS
CYLINDO
DEEP
ETCH
PHOTOS
LIFESTYLE
PHOTOS
PRODUCTION ORDER
PRODUCT INFO SHEET
1312

DIRECTORS

CHAIR

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
1413

SWIVEL DINING

CHAIR

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
1514

ETO

DESK

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
1615

ETO

ACCESSORIES

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
1716

ELEVATE

DESK

  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
1817

LUNA

OUTDOOR

COUNTERSTOOL

N/A

N/A

N/A

  •  
  •  
  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
1918

LUNA

OUTDOOR

BARSTOOL

N/A

N/A

N/A

  •  
  •  
  •  
  •  

N/A

  •  
  •  
  •  
  •  
  •  
  •  
  •