21/8 - 1/9:
FIREFLY: CAD and prototyping parts for the large size - Jordan
FIREFLY: CAD and prototyping parts for the small size - Jordan
FIREFLY: electrical specification for large size - Jordan
FIREFLY: electrical specification for small size - Jordan
FIREFLY: finishes specification for large size - Jordan
FIREFLY: finishes specification for small size - Jordan
SWIVEL: prototype seat and backrest molded part (positive or negative), strong spine. To be covered - Jordan
SWIVEL: finish assembling base with John (steel frame and 3D prints) - Mina
SWIVEL: detail design injection moulded leg, implementing updates - Mina
HELIO MODULAR: electrical specification document - Mina
DIRECTORS CHAIR: test bolt through leg cap and into hole in base rail - Mina - iterations discussed
DIRECTORS CHAIR: new cover documentation indicating texteline mesh internal layer on sides. Rivet/screw press stud bases - Mina
DIRECTORS CHAIR: knockin tolerance modifications and model new knockins - Mina
DIRECTORS CHAIR: ideate KING logo on backrest, confirm scale and share with GL to sample - Mina
WEEKLY MEETING AGENDA:
Review the list each meeting to resolve any issues
Set achievable targets for the following week
Mina will send out weekly worklist
Mina will update progress on Jira and Confluence
PROJECT ARCHIVE:
ELEMENT TABLE
OFFICE CHAIR
ADJUSTABLE FLOOR LAMP
GRACE CABINET
MISCELLANEOUS TASK LIST:
Ask Coffey and James about US certification. Attach Melinda’s document. List products currently on sale and in development. What do we need for introduction?
Sea freight galvanised Luna Dining Chair to TU
Luma Light 2.0 - implement ideas and features from discussions with Coffey
Visit couple of showrooms and review Luna Dining Chair mesh. Request reflock if necessary.
Update Luna Dining Chair product card with rope arm detail
Lighting QC checklists
Documents for Lume Light head spare part + packaging
Sand blasting chamber - use Ryan 3D printed link
Source more hardware storage boxes and mount to the wall above fire extinguishers
Timber scrap storage rack on brick wall next to dust extractor https://www.pinterest.com.au/pin/534309943271626748/
GL PROJECTS:
PROJECT | No. | OPEN DATE | RISK | TOPIC | STATEMENT | ACTION | RESPONSIBILITY | PLANNED CLOSED DATE | ACTUAL CLOSE DATE | % COMPLETE |
---|---|---|---|---|---|---|---|---|---|---|
DIRECTORS CHAIR | 1 | Jun 13, 2023 | G | 2x extrusion tools | Awaiting tools to be complete | Follow up with Shiyang | SHIYANG | Jun 21, 2023 | Jul 20, 2023 | 100% |
DIRECTORS CHAIR | 1 | Jun 13, 2023 | G | 7x injection mould tools | Awaiting completion of injection moulded parts | Follow up with Shiyang | SHIYANG | Aug 14, 2023 | Aug 14, 2023 | 100% |
DIRECTORS CHAIR | 1 | Jun 13, 2023 | G | BOM | Awaiting complete BOM | Follow up with Shiyang | SHIYANG | Jun 21, 2023 | Jul 20, 2023 | 100% |
DIRECTORS CHAIR | 1 | Jun 13, 2023 | G | Alternate BOM | Awaiting alternate BOM with stainless steel cross brace. May need this for strength. | Follow up with Shiyang | SHIYANG | Jun 21, 2023 | Jul 23, 2023 | 100% |
DIRECTORS CHAIR | 1 | Aug 4, 2023 | Y | Bending tool | Awaiting bending tool from a supplier for one of the manufacturing process options | Follow up with Shiyang | SHIYANG | Sep 5, 2023 | TBD | 25% |
DIRECTORS CHAIR | 1 | Jun 13, 2023 | Y | Complete sample | Awaiting above tasks to be completed in order to sample the chair | Follow up with Shiyang | SHIYANG | Aug 2, 2023 | TBD | 25% |
ETO DESK | 1 | Jan 6, 2023 | Y | Cable clip + cable holder tooling | CAPEX paid, waiting completed of parts | Follow up with Shiyang | SHIYANG | Mar 8, 2023 | TBD | 25% |
ETO DESK | 1 | Mar 1, 2023 | Y | Mains power housing tooling | Awiting production of custom part. Tooling CAPEX approved | Follow up with Shiyang | SHIYANG | Mar 17, 2023 | TBD | 50% |
ETO DESK | 1 | Apr 25, 2023 | Y | Die cast rail tooling | Awaiting implementation of update | Follow up with Shiyang | SHIYANG | Sep 25, 2023 | TBD | 50% |
ELEVATE DESK | 1 | Aug 4, 2023 | Y | M2 electrical updates | Need new wiring harness and sample that implements updates. Most notably ZETR GPO | Follow up with Shiyang | SHIYANG | Sep 7, 2023 | TBD | 25% |
ELEVATE DESK | 1 | Aug 4, 2023 | Y | Oval extrusion tooling and production | Need CAPEX raised, tool produced and part sampled | Follow up with Shiyang | SHIYANG | Sep 7, 2023 | TBD | 25% |
ELEVATE DESK | 1 | Aug 4, 2023 | Y | Plastic leg flange tooling and production | Need CAPEX raised, tool produced and part sampled | Follow up with Shiyang | SHIYANG | Sep 7, 2023 | TBD | 25% |
LUNA OUT BAR | 1 | Jul 12, 2023 | Y | Complete sample with pressed mesh tooling | Need new welding jig produced. To make complete sample with seat geometry matching the counterstool | Follow up with Shengming | SHIYANG | Aug 20, 2023 | TBD | 25% |
INFINITELUX PROJECTS:
PROJECT: | No. | OPEN DATE | RISK | TOPIC | STATEMENT | ACTION | RESPONSIBILITY | PLANNED CLOSED DATE | ACTUAL CLOSE DATE | % COMPLETE |
---|---|---|---|---|---|---|---|---|---|---|
SPIA PENDANT | 1 | Mar 10, 2023 | G | Packaging sample | Awaiting completion of packaging sample. | Follow up with Coffey | COFFEY SHEN | Mar 30, 2023 | Aug 21, 2023 | 100% |
SPIA PENDANT | 1 | Mar 30, 2023 | Y | Production order | Awaiting completion of first production order | Follow up with Coffey | COFFEY SHEN | Jun 1, 2023 | TBD | 25% |
SOLAIR | 1 | Mar 10, 2023 | Y | Updated sample | Awaiting complettion of updated sample | Follow up with Coffey | COFFEY SHEN | Apr 7, 2023 | TBD | 25% |
SOLAIR | 1 | Mar 10, 2023 | Y | Photography samples | Awaiting photography samples that include updated feedback | Follow up with Coffey | COFFEY SHEN | Apr 7, 2023 | TBD | 25% |
ETO TASK LIGHT | 1 | May 16, 2023 | Y | Second sample | Awaiting completion of updated sample implementing feedback on first | Follow up with Coffey | COFFEY SHEN | Jun 16, 2023 | TBD | 25% |
ETO TABLE LAMP | 1 | May 16, 2023 | Y | Second sample | Awaiting completion of updated sample implementing feedback on first | Follow up with Coffey | COFFEY SHEN | Jun 16, 2023 | TBD | 25% |
PRODUCTION CHECKLIST:
PACKAGING CAD | PACKAGING DOCS(SHARE WITH GRANT) | ASSEMBLY INSTRUCTIONS(SHARE WITH GRANT) | PRODUCT CARD | COSTINGS (BOM) | SAP | PRICING | FLOCKORDER | SPAREPARTS | DESIGN DISCLOSURE DOCUMENT + REGISTRATION DRAWINGS | CYLINDO | DEEPETCH | LIFESTYLE | PRODUCTION ORDER | PRODUCT INFO SHEET | |
INFINITELUX PROJECTS: | |||||||||||||||
FIREFLY | |||||||||||||||
FARO PENDANT | N/A | N/A | |||||||||||||
SOLAIR | N/A | ||||||||||||||
HELIO STRAIGHT PENDANT | N/A | ||||||||||||||
HELIO ROUND PENDANT | N/A | ||||||||||||||
HELIO MODULAR | N/A | ||||||||||||||
ETO TASK LIGHT | N/A | ||||||||||||||
ETO TABLE LAMP | N/A | ||||||||||||||
GL PROJECTS: | |||||||||||||||
PACKAGING CAD | PACKAGING DOCS(SHARE WITH GRANT) | ASSEMBLY INSTRUCTIONS(SHARE WITH GRANT) | PRODUCT CARD | COSTINGS (BOM) | SAP | PRICING | FLOCKORDER | SPAREPARTS | DESIGN DISCLOSURE DOCUMENT + REGISTRATION DRAWINGS | CYLINDO | DEEPETCH | LIFESTYLE | PRODUCTION ORDER | PRODUCT INFO SHEET | |
DIRECTORS CHAIR | |||||||||||||||
DIRECTORS CHAIR | |||||||||||||||
SWIVEL DINING CHAIR | |||||||||||||||
ETO DESK | |||||||||||||||
ETO ACCESSORIES | |||||||||||||||
ELEVATE DESK | |||||||||||||||
LUNA OUTDOOR COUNTERSTOOL | N/A | N/A | N/A | N/A | |||||||||||